PLATAFORMA SOLAR DE ALMERÍA<br />

Funding: 6 th FP. Global Change and Ecosystems.; 2.750 k€. CIEMAT<br />

Budget: 350 K€.<br />

Duration: November <strong>2006</strong> – October 2009<br />

Motivation: Granulated aerobic biomass, combination of advanced oxidation<br />

processes and biological treatment and integration of membrane processes<br />

are all consi<strong>de</strong>red high-potential innovations for <strong>de</strong>velopment of industrial<br />

process wastewater treatment. These technologies will be applied to different<br />

industrial effluents (lixiviates, pharmaceuticals, pestici<strong>de</strong>s, paper industry,<br />

etc.).<br />

Purposes: (i) Study and increase the performance of promising options for<br />

industrial wastewater treatment, such as, e.g., aerobic granulation, membrane<br />

contactors and chemical membrane reactors. (ii) Advance in both fundamental<br />

knowledge and technology. (iii) Evaluate economic and ecological<br />

sustainability of these technology options. (iv) Develop integrated solutions<br />

tailored to the requirements of the final user, valid in different industrial sectors<br />

and favoring their implementation to increase competitiveness in the EU<br />

water industry. (v) Transfer the knowledge <strong>de</strong>veloped to potentially interested<br />

final users insi<strong>de</strong> and outsi<strong>de</strong> the scope of the project.<br />

Project organization is shown in Figure 4.5. The scientific research and<br />

technological <strong>de</strong>velopment tasks are concentrated in Work Packages WP1,<br />

WP2 and WP3. These work packages are complemented by life-cycle and lifetime<br />

cost analyses, the results of which should be solutions <strong>de</strong>signed for concrete<br />

cases of waste water in different sectors of industry. This work will be<br />

done in Work Package WP4. Two additional work packages (WP5 and WP6)<br />

complete the project. The CIEMAT-PSA is the coordinator of WP2. The research<br />

task of the CIEMAT-PSA concentrates on wi<strong>de</strong>ning the existing knowledge<br />

on combining the solar photo-Fenton process with biological treatments.<br />

It is inten<strong>de</strong>d for treatment of waste water severely polluted by pestici<strong>de</strong>s,<br />

formulation agents and industrial pharmaceutical waste, increasing knowledge<br />

of how the structure of the pollutant affects the evolution of severe toxicity<br />

Figure 4.5<br />

INNOWATECH project structure<br />