Annual Report 2006 - Plataforma Solar de AlmerÃa
Annual Report 2006 - Plataforma Solar de AlmerÃa
Annual Report 2006 - Plataforma Solar de AlmerÃa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CONCENTRATING SOLAR SYSTEMS UNIT<br />
3.3.2 Development of the molten salt receiver for a solar<br />
thermal power plant<br />
Participants: SENER Ingeniería y Sistemas, S.A. (E), PSA-CIEMAT (E); [2<br />
CIEMAT Divisions participate in this project: a) PSA-CIEMAT, b) CIEMAT-<br />
Structural Materials Division].<br />
Contacts: Juan Ignacio Burgaleta (ignacio.burgaleta@sener.es); Félix M. Téllez<br />
(felix.tellez@ciemat.es)<br />
Funding: Sener (65%) and CIEMAT (35%). Total estimated cost 6 M€, of<br />
which 1.5 M€ are for equipment.<br />
Duration: November 17, 2005 to December 31, 2007.<br />
Background: In 2004-2005, Boeing withdrew its offer to build the <strong>Solar</strong> Tres<br />
receiver, compromising continuation of the project in the absence of an alternative<br />
commercial offer. In view of this situation, Sener <strong>de</strong>ci<strong>de</strong>d to un<strong>de</strong>rtake<br />
the engineering and <strong>de</strong>velopment of the molten salt receiver for <strong>Solar</strong> Tres on<br />
its own. Nevertheless, in or<strong>de</strong>r to reduce the <strong>de</strong>velopment risk, it requested<br />
CIEMAT assistance in sharing in the <strong>de</strong>sign and validation of a tube salt receiver,<br />
including <strong>de</strong>sign, building and testing a receiver panel prior to the fabrication<br />
of the <strong>Solar</strong> tres receiver, which will consist of 16 such panels. In the<br />
second half of 2005, Sener and CIEMAT signed a collaboration agreement for<br />
receiver technology validation (with Sener-CIEMAT technology) and <strong>de</strong>finition<br />
of operating and control strategies to be applied in solar thermal power plants<br />
(starting with <strong>Solar</strong> Tres).<br />
Purpose: i) Reduce the risk associated with the first own <strong>de</strong>velopment of a<br />
molten-salt central-receiver solar thermal power plant technology, ii) Experimental<br />
validation of the <strong>Solar</strong> Tres receiver <strong>de</strong>sign, iii) Review of the selection<br />
of materials and geometries to extend the lifetime expectancy of the receiver.<br />
The equipment <strong>de</strong>veloped for the experiment is almost the complete system,<br />
lacking only the turbine and generator. It inclu<strong>de</strong>s the 4-MW thermal receiver<br />
Figure 3.9<br />
Salt Receiver Panel during testing at the 70-m level of the CESA-1 tower;<br />
diagram of the experimental <strong>de</strong>vice and front view of the receiver panel<br />
with si<strong>de</strong> shielding.<br />
45