12.06.2014 Views

Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia

Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia

Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rehabilitation & Landscape<br />

Management Plan<br />

3.3 Medium & Long-term Management Measures<br />

The rehabilitation measures described in Section 3.2 will continue to be implemented<br />

over the life of mining at <strong>Bengalla</strong>. This will ensure the rehabilitation activities result in a<br />

final landform which is undulating and free-draining (Figure 1) and has post-mining land<br />

capability (Figure 2) as determined in consultation with relevant stakeholders.<br />

In particular, the completion criteria and performance monitoring discussed further in<br />

Section 3.4 provide an evaluation mechanism of the rehabilitation measures being<br />

implemented. The rehabilitation measures are subject to continuous review and<br />

improvement, reflecting the results of performance monitoring and progress towards<br />

rehabilitation targets.<br />

3.4 Completion Criteria<br />

Initial completion criteria for the short-term (annual), medium-term (< 5 yrs) and longterm<br />

(life of mine) have been developed to achieve the site rehabilitation objectives and<br />

are shown in Table 4. Rehabilitation that achieves the completion criteria will be<br />

considered to be sustainable without ongoing management and therefore suitable for<br />

mining lease relinquishment.<br />

The completion criteria include success indicators and monitoring requirements to<br />

monitor the successful establishment of rehabilitation and trigger remedial action, where<br />

necessary. This will ensure that rehabilitation achieves the completion criteria in a<br />

suitable timeframe, consistent with the mine closure plan.<br />

Ref: 071025 bmc rehabilitation & landscape mp Page 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!