Environmental procedure EP 2.1<br />
Where possible, all known archaeological sites within the mining area are to<br />
be salvaged by Indigenous groups prior to land disturbance.<br />
4.4.2 European Heritage Sites<br />
European heritage sites determined to be of State significance will be listed<br />
on the State Heritage Register. Approval will be sought under s60 of the<br />
NSW Heritage Act, 1977 for any disturbance of relics determined to be of<br />
state significance.<br />
If any European heritage site identified within the mining lease is listed on<br />
or listed for inclusion on the Register of the National Estate, the <strong>Australia</strong>n<br />
Heritage Commission must be contacted for advice on its management.<br />
4.5 Site Management<br />
4.5.1 Aboriginal Heritage Sites<br />
All Aboriginal heritage sites and places will be recorded on the CNA<br />
Aboriginal Cultural Heritage Database. Maps showing the location of these<br />
sites are available on CNA’s intranet.<br />
All sites within the mine project area which are to be conserved will be<br />
fenced and signposted. Mine personnel and contractors will be made aware<br />
of these heritage sites and directed not to enter them without Environmental<br />
Services’ approval.<br />
4.4.2 European Heritage Sites<br />
All identified European heritage sites will be recorded on the CNA<br />
European Cultural Heritage Database. Maps showing the location of these<br />
sites are available on CNA’s intranet.<br />
European heritage sites are not to be disturbed or modified in any way<br />
without approval from Manager Environmental Services.<br />
5. Responsibilities<br />
Manager Aboriginal<br />
Affairs<br />
Manager Project<br />
Approvals<br />
title<br />
EP 2.1<br />
Cultural Heritage Management<br />
• Organise Archaeological surveys and excavations<br />
and any permits or consents relating to cultural<br />
heritage<br />
• Consult with Aboriginal groups, Archeologists and<br />
Government Bodies<br />
• Coordinate cultural heritage training programs<br />
• Manage the identification and fencing of heritage<br />
sites<br />
• Organise archaeological surveys that are part of<br />
environmental impact assessment projects<br />
• Manage the Ground Disturbance Permit system<br />
• Maintain the heritage site GIS (MapInfo) database<br />
and communicate the locations of sites to mine<br />
date issued<br />
3/8/04<br />
revision status<br />
1.4<br />
date reviewed<br />
10/3/05<br />
Printed documents are uncontrolled. Check the <strong>Coal</strong> & Allied Intranet for the latest version of this document.<br />
page<br />
4 of 5