Environmental procedure EP 5.1<br />

EP 5.1<br />

REHABILITATION<br />

1. Purpose<br />

To ensure that:<br />

• vegetation removal ahead of mining is conducted in accordance with a<br />

Ground Disturbance Permit (except for <strong>Bengalla</strong>) and managed to<br />

minimise soil erosion;<br />

• topsoil is correctly stripped, handled, stockpiled and reused;<br />

• disturbed areas are rehabilitated progressively in compliance with DMR<br />

requirements and are managed to ensure their success.<br />

2. Scope<br />

This Procedure applies to all CNA managed mines, infrastructure and any<br />

associated activity directly managed by CNA.<br />

3. Definitions<br />

DMR Compliance<br />

MOP<br />

Optimum Soil<br />

Moisture<br />

Operation meets requirements of the accepted MOP and<br />

Lease Conditions<br />

<strong>Mining</strong> Operations Plan<br />

The moisture content range where<br />

• soil compaction does not occur due to working of<br />

moist clays and<br />

• breakdown of soil structure does not occur due to<br />

insufficient moisture in the soil<br />

4. Actions<br />

4.1 Preparations for Vegetation Removal and Soil Stripping<br />

The area to be stripped, including roads and other infrastructure, will be<br />

determined by the Mine Planning Department, pegged and clearly marked<br />

by the Mine Surveyor or Civil Works Department prior to any work<br />

commencing.<br />

Prior to vegetation removal and soil stripping:<br />

• a Ground Disturbance Permit must be obtained (except at <strong>Bengalla</strong>) from<br />

Environmental Services by the relevant job coordinator or CNA person<br />

title<br />

EP 5.1<br />

REHABILITATION<br />

date issued<br />

3/8/04<br />

revision status<br />

1.3<br />

date reviewed<br />

20/1/05<br />

Printed documents are uncontrolled. Check the <strong>Coal</strong> & Allied Intranet for the latest version of this document.<br />

page<br />

1 of 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!