Rehabilitation & Landscape<br />
Management Plan<br />
Two options are currently available at <strong>Bengalla</strong> in regards to mine planning and ultimate<br />
mine closure. The first option is as currently approved, mine closure in 2017, with a final<br />
void located to the west. The second option relates to large areas of identified coal<br />
reserves to the west of currently approved mining operations at <strong>Bengalla</strong>. Should<br />
<strong>Bengalla</strong> seek and be granted approval to continue mining to uncover these coal<br />
reserves, then mine closure would be rescheduled and the final location of the final void<br />
would be altered.<br />
1.4 Document Structure<br />
This RLMP is structured as follows:<br />
• Section 2.0 describes <strong>Bengalla</strong>’s Environmental Management System (EMS) with<br />
particular reference to rehabilitation and mine closure aspects;<br />
• Section 3.0 provides <strong>Bengalla</strong>’s Rehabilitation Management Plan, describing:<br />
o The overall objective for rehabilitation;<br />
o The rehabilitation and management measures to be implemented over the<br />
next five years;<br />
o The ongoing medium and long-term rehabilitation and management measures<br />
to be implemented, beyond the five year period of this RLMP; and<br />
o The completion criteria, success indicators and performance monitoring<br />
techniques to measure the success of rehabilitation.<br />
• Section 4.0 provides the preliminary Final Void Management Plan based on<br />
information available to date, including:<br />
o A justification for the final void design and location;<br />
o A conceptual design criteria for the final void, utilising preliminary information<br />
and the results of a recent groundwater assessment; and<br />
o Conceptually describing the actions and control measures required for the<br />
final void.<br />
• Section 5.0 presents the preliminary Mine Closure Plan, including a preliminary<br />
discussion on:<br />
o The preliminary overall objectives for mine closure;<br />
o The potential post mining land use for the mine site;<br />
o The conceptual design criteria for mine closure, with reference to those items<br />
which are anticipated to be removed or retained;<br />
o The conceptual environmental management and monitoring network after<br />
mine closure; and<br />
o The conceptual measures for evaluating performance after mine closure.<br />
• Section 6.0 describes the stakeholder consultation undertaken in relation to<br />
rehabilitation and mine closure to date;<br />
• Section 7.0 outlines the reporting and review requirements of this RLMP; and<br />
• Section 8.0 lists actions and key responsibilities associated with this RLMP.<br />
Ref: 071025 bmc rehabilitation & landscape mp Page 4