Rehabilitation & Landscape<br />
Management Plan<br />
therefore been adopted as the preferred post-mining land use in suitable areas of the<br />
site, with a focus on linking remnant vegetation with rehabilitation.<br />
Further assessment and stakeholder consultation in relation to mine closure and<br />
post-mining land uses will be conducted during preparation of the detailed Mine Closure<br />
Plan.<br />
5.3 Mine Infrastructure<br />
In accordance with the <strong>Mining</strong> Lease conditions and the current development consent,<br />
BMC is required to remove all infrastructure, plant equipment and works with no ongoing<br />
beneficial use after mine closure in 2017. However, it is expected that many<br />
infrastructure items may be retained at mine closure due to their beneficial use for a<br />
variety of post-mining land uses. The need for decommissioning of site infrastructure will<br />
be assessed in detail in consultation with relevant stakeholders during preparation of the<br />
MOP and detailed Mine Closure Plan.<br />
As discussed in Section 1.2, if <strong>Bengalla</strong> seeks and gains additional approval to continue<br />
mining operations to the west, all the relevant infrastructure will be retained and<br />
enhanced and maintained in accordance with EP 10.1.<br />
5.4 Environmental Management<br />
Ongoing monitoring and management of environmental performance will continue to be<br />
undertaken for five years after mine closure or until such time as monitoring results<br />
demonstrate that the site meets the closure criteria. Detailed closure criteria and<br />
associated monitoring and maintenance programs will be included in the revised Mine<br />
Closure Plan. Mine closure monitoring will include at least the following:<br />
• Rehabilitation and closure completion criteria/success indicators;<br />
• Groundwater;<br />
• Surface water; and<br />
• Air quality.<br />
5.5 Performance Measurement<br />
The performance of the rehabilitation of the site at mine closure will be monitored in<br />
accordance with the monitoring programs specified in Table 4. The assessment of the<br />
monitoring results will enable the confirmation of achievement of the success indicators<br />
and associated completion criteria. Once the completion criteria have been achieved, as<br />
demonstrated by monitoring results, application for <strong>Mining</strong> Lease relinquishment will be<br />
requested.<br />
Ref: 071025 bmc rehabilitation & landscape mp Page 22