Rehabilitation & Landscape<br />

Management Plan<br />

The location and use of the final void will continue to be investigated during detailed<br />

mine closure planning and further detail will be provided in the next revision of the Final<br />

Void Management Plan.<br />

4.2 Design Criteria<br />

The final void will be managed and designed such that the low wall is at a slope of no<br />

greater than 18 o and will be rehabilitated with pasture species suitable for surface<br />

stability. Benches will be incorporated at regular intervals along the low wall where<br />

practical (Hannan, 2003). Any exposed coal seams will be covered in accordance with<br />

EP 4.1 Closure Planning Guidelines.<br />

The steep slope of the high wall will be designed to a stable gradient, based on<br />

assessments of geotechnical stability and risk, to be undertaken as agreed with DPI.<br />

Fencing will be constructed across the high wall to restrict cattle and pedestrian access as<br />

agreed with DPI. A steep ditch and bund wall may also be constructed at a short distance<br />

back from the high wall, so as to prevent inadvertent vehicular access as agreed with<br />

DPI.<br />

Water management structures will be utilised to divert as much of the surrounding<br />

surface water catchment away from the void. However, the void will still collect water<br />

draining from the high wall and from the area of the low wall beneath the lowest<br />

diversion bank. Diversion banks with a capacity to convey a relevant level of peak runoff<br />

storm events will be constructed above the low wall to convey and redirect runoff.<br />

4.3 Actions & Control Measures<br />

As described in Section 4.2, the action and control measures to manage any impacts of<br />

the final void will be incorporated into the void design. The detailed Final Void<br />

Management Plan will include detailed design and specification of the final void and<br />

associated control measures. Development of the Plan will also include further<br />

assessment and stakeholder consultation in relation to the potential post-mining land use<br />

for the void.<br />

Ref: 071025 bmc rehabilitation & landscape mp Page 19