Rehabilitation & Landscape<br />
Management Plan<br />
The location and use of the final void will continue to be investigated during detailed<br />
mine closure planning and further detail will be provided in the next revision of the Final<br />
Void Management Plan.<br />
4.2 Design Criteria<br />
The final void will be managed and designed such that the low wall is at a slope of no<br />
greater than 18 o and will be rehabilitated with pasture species suitable for surface<br />
stability. Benches will be incorporated at regular intervals along the low wall where<br />
practical (Hannan, 2003). Any exposed coal seams will be covered in accordance with<br />
EP 4.1 Closure Planning Guidelines.<br />
The steep slope of the high wall will be designed to a stable gradient, based on<br />
assessments of geotechnical stability and risk, to be undertaken as agreed with DPI.<br />
Fencing will be constructed across the high wall to restrict cattle and pedestrian access as<br />
agreed with DPI. A steep ditch and bund wall may also be constructed at a short distance<br />
back from the high wall, so as to prevent inadvertent vehicular access as agreed with<br />
DPI.<br />
Water management structures will be utilised to divert as much of the surrounding<br />
surface water catchment away from the void. However, the void will still collect water<br />
draining from the high wall and from the area of the low wall beneath the lowest<br />
diversion bank. Diversion banks with a capacity to convey a relevant level of peak runoff<br />
storm events will be constructed above the low wall to convey and redirect runoff.<br />
4.3 Actions & Control Measures<br />
As described in Section 4.2, the action and control measures to manage any impacts of<br />
the final void will be incorporated into the void design. The detailed Final Void<br />
Management Plan will include detailed design and specification of the final void and<br />
associated control measures. Development of the Plan will also include further<br />
assessment and stakeholder consultation in relation to the potential post-mining land use<br />
for the void.<br />
Ref: 071025 bmc rehabilitation & landscape mp Page 19