Rehabilitation & Landscape<br />
Management Plan<br />
8.0 Responsibilities<br />
Table 5 details management measures and summarises responsibilities. Responsibilities<br />
may be delegated as required.<br />
Table 5<br />
Management Measures and Responsibilities<br />
Ref Control Measure Responsibility Timing CNA EMS<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
Ensure rehabilitation design meets the<br />
requirements of the MOP and as outlined in<br />
Section 3.1.<br />
Complete rehabilitation in accordance with the<br />
management techniques of the EMS and as<br />
described in Section 3.2.<br />
Undertaken annual inspections of rehabilitation,<br />
focusing on vegetation and soil parameters<br />
described in Section 3.2.5.<br />
Conduct a flora and fauna survey of<br />
rehabilitation and future mining areas with an<br />
appropriately qualified ecologist.<br />
Undertake rehabilitation maintenance techniques<br />
discussed in Section 3.2.6 and implement<br />
ameliorative action as required.<br />
Monitor and review progress against success<br />
indicators and completion criteria listed in Table<br />
4. Apply ameliorative measures as necessary.<br />
Mine Manager Annually EP 5.1<br />
Mine Manager Annually EP 5.1<br />
Environmental<br />
Specialist<br />
Environmental<br />
Specialist<br />
Environmental<br />
Specialist<br />
Environmental<br />
Specialist<br />
Annually<br />
Five<br />
Yearly<br />
EP 5.1,<br />
EP 10.2<br />
EP 5.1,<br />
EP 10.2<br />
Annually EP 5.1<br />
Six<br />
monthly<br />
EP 5.1<br />
7<br />
Review and update conceptual completion<br />
criteria based on monitoring results.<br />
Environmental<br />
Specialist<br />
Ongoing EP 5.1<br />
8<br />
Undertake further investigation and consultation<br />
in relation to the post-mining land use at<br />
<strong>Bengalla</strong>.<br />
Environmental<br />
Specialist<br />
Five<br />
Yearly<br />
EP 5.1<br />
9<br />
Provide further detail and planning on the mine<br />
closure strategy and final void design in next<br />
revision of the RLMP.<br />
Environmental<br />
Specialist<br />
Five<br />
Yearly<br />
EP 5.1<br />
Ref: 071025 bmc rehabilitation & landscape mp Page 24