Rehabilitation & Landscape<br />
Management Plan<br />
Table 1<br />
Rehabilitation & Landscape Management Plan Requirements<br />
Condition Requirement Section<br />
33<br />
By end of July 2007, the Applicant must prepare (and following approval<br />
implement) a detailed Rehabilitation and Landscape Management Plan<br />
for the development, in consultation with affected agencies, and to the<br />
satisfaction of the DPI and the Director-General. This plan must be<br />
prepared by suitably qualified expert/s whose appointment/s have been<br />
approved by the Director-General, and must include a:<br />
(a)<br />
Rehabilitation Management Plan;<br />
This<br />
RLMP<br />
(b)<br />
(c)<br />
Final Void Management Plan; and<br />
Mine Closure Plan.<br />
34<br />
The Rehabilitation Management Plan must include:<br />
(a) the rehabilitation objectives for the site; 3.1<br />
(b)<br />
(c)<br />
(d)<br />
(e)<br />
a description of the short, medium, and long term measures that<br />
would be implemented to:<br />
• rehabilitate the site; and<br />
• manage the remnant vegetation and habitat on the site;<br />
detailed assessment and completion criteria for the rehabilitation<br />
of the site;<br />
a detailed description of how the performance of the rehabilitation<br />
of the mine would be monitored over time to achieve the stated<br />
objectives;<br />
a detailed description of what measures would be implemented<br />
over the next 5 years to rehabilitate and manage the landscape of<br />
the site including the procedures to be implemented for:<br />
3.2 &<br />
3.3<br />
3.4<br />
3.2.5 &<br />
4.0<br />
3.2<br />
• progressively rehabilitating areas disturbed by mining; 3.2.3 &<br />
3.2.4<br />
• implementing revegetation and regeneration; 3.2.4<br />
• protecting areas outside the disturbance areas; 3.2.1<br />
• managing impacts on fauna; 3.2.1<br />
• conserving and reusing topsoil; 3.2.1 &<br />
3.2.3<br />
• collecting and propagating seed for rehabilitation works; 3.2.1<br />
• salvaging and reusing material from the site for habitat<br />
enhancement;<br />
3.2.1<br />
• controlling weeds and feral pests; 3.2.6<br />
• controlling access; 3.2.5<br />
• bushfire management; 3.2.6<br />
• managing any identified conflicts between the rehabilitation of<br />
the mine and Aboriginal cultural heritage; and<br />
3.2.1<br />
Ref: 071025 bmc rehabilitation & landscape mp Page 2