Environmental procedure EP 5.1<br />

Site Mine Planners<br />

Civil Works<br />

Department<br />

<strong>Mining</strong> Department<br />

• Prepare MOPs in accordance with DMR<br />

requirements<br />

• Ensure mine rehabilitation plans are consistent with<br />

the relevant MOP<br />

• Supervise contract rehabilitation works to meet MOP<br />

and EMS requirements<br />

• Obtain Ground Disturbance Permit prior to<br />

disturbing undisturbed ground<br />

• Excavate and place overburden in accordance with<br />

mine plans<br />

• Obtain Ground Disturbance Permit prior to<br />

disturbing undisturbed ground<br />

6. References<br />

Ground disturbance permit<br />

Attachment EP5.1.1: Species mix and seed application rates for mine<br />

rehabilitation<br />

Revisions<br />

Number Date Description of Change<br />

1 12/9/2003 First Release<br />

2 3/8/04 <strong>Bengalla</strong> ground disturbance process defined<br />

3 20/1/05 Weed inspection frequency defined<br />

title<br />

EP 5.1<br />

date issued<br />

3/8/04<br />

revision status<br />

1.3<br />

date reviewed<br />

20/1/05<br />

page<br />

8 of 8<br />

REHABILITATION<br />

Printed documents are uncontrolled. Check the <strong>Coal</strong> & Allied Intranet for the latest version of this document.