Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia
Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia
Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Rehabilitation & Landscape<br />
Management Plan<br />
Objective<br />
Long-term Completion Criteria<br />
(i.e. Life of Mine)<br />
Medium-term Success Indicators<br />
(i.e. < 5 years)<br />
Short-term Monitoring<br />
(i.e. Annually)^<br />
• Minimum of 70% vegetative cover<br />
over 80% of rehabilitated areas *<br />
• Suitable pasture species dominant<br />
• Minimal presence of weeds (esp.<br />
Galenia sp)<br />
• Weed control and ameliorative<br />
measures as necessary<br />
• Tree plots recruitment rates are<br />
equal to or exceed mortality rates<br />
• Grazing conducted in accordance<br />
with land classes<br />
• Tree plots indicating good growth<br />
and mortality rates – nearing<br />
completion criteria<br />
• Successful small trials of grazing<br />
• Monitoring of vegetation and<br />
erosion and sediment control as<br />
discussed in Section 3.2.5<br />
Surface run-off is not<br />
polluting waters<br />
off site<br />
• Water leaving site must meet EPL<br />
6538 criteria of pH between 6.5<br />
and 9.5 and TSS of < 120 mg/L<br />
• Water monitoring results within<br />
limits of EPL 6538 and all dirty water<br />
retained on site<br />
• Monitoring and inspection of<br />
water management structures by<br />
appropriately qualified person<br />
FINAL VOID<br />
• Design to stable gradient by<br />
geotechnical personnel, if<br />
necessary blast<br />
• Final high wall meets design<br />
requirements, geotechnical stable<br />
• Monitoring confirms stability<br />
• Monitoring of high wall stability<br />
All hazards associated<br />
with the final high<br />
wall and low wall are<br />
controlled<br />
• Fencing established along the<br />
entire length of the final high wall,<br />
preventing pedestrian and live<br />
stock access<br />
• Berms, trenches and catch<br />
benches established at<br />
appropriate intervals where<br />
necessary<br />
• Implementation and ongoing<br />
maintenance of fencing<br />
• Exclusion of access<br />
• Implementation of berms and<br />
trenches at regular intervals<br />
• Stability of berms and trenches<br />
• Regular monitoring of fence<br />
condition and restriction of<br />
access<br />
• Regular monitoring and/or<br />
maintenance of berms and<br />
trenches<br />
Ref: 071025 bmc rehabilitation & landscape mp Page 16