12.06.2014 Views

Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia

Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia

Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rehabilitation & Landscape<br />

Management Plan<br />

Objective<br />

Long-term Completion Criteria<br />

(i.e. Life of Mine)<br />

Medium-term Success Indicators<br />

(i.e. < 5 years)<br />

Short-term Monitoring<br />

(i.e. Annually)^<br />

• Minimum of 70% vegetative cover<br />

over 80% of rehabilitated areas *<br />

• Suitable pasture species dominant<br />

• Minimal presence of weeds (esp.<br />

Galenia sp)<br />

• Weed control and ameliorative<br />

measures as necessary<br />

• Tree plots recruitment rates are<br />

equal to or exceed mortality rates<br />

• Grazing conducted in accordance<br />

with land classes<br />

• Tree plots indicating good growth<br />

and mortality rates – nearing<br />

completion criteria<br />

• Successful small trials of grazing<br />

• Monitoring of vegetation and<br />

erosion and sediment control as<br />

discussed in Section 3.2.5<br />

Surface run-off is not<br />

polluting waters<br />

off site<br />

• Water leaving site must meet EPL<br />

6538 criteria of pH between 6.5<br />

and 9.5 and TSS of < 120 mg/L<br />

• Water monitoring results within<br />

limits of EPL 6538 and all dirty water<br />

retained on site<br />

• Monitoring and inspection of<br />

water management structures by<br />

appropriately qualified person<br />

FINAL VOID<br />

• Design to stable gradient by<br />

geotechnical personnel, if<br />

necessary blast<br />

• Final high wall meets design<br />

requirements, geotechnical stable<br />

• Monitoring confirms stability<br />

• Monitoring of high wall stability<br />

All hazards associated<br />

with the final high<br />

wall and low wall are<br />

controlled<br />

• Fencing established along the<br />

entire length of the final high wall,<br />

preventing pedestrian and live<br />

stock access<br />

• Berms, trenches and catch<br />

benches established at<br />

appropriate intervals where<br />

necessary<br />

• Implementation and ongoing<br />

maintenance of fencing<br />

• Exclusion of access<br />

• Implementation of berms and<br />

trenches at regular intervals<br />

• Stability of berms and trenches<br />

• Regular monitoring of fence<br />

condition and restriction of<br />

access<br />

• Regular monitoring and/or<br />

maintenance of berms and<br />

trenches<br />

Ref: 071025 bmc rehabilitation & landscape mp Page 16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!