Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia
Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia
Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Rehabilitation & Landscape<br />
Management Plan<br />
2.0 Environmental Management System<br />
BMC has in place an EMS accredited to the International Standards Organisation (ISO)<br />
14001 standard. The EMS is designed so that BMC can:<br />
• Effectively manage its environmental issues;<br />
• Ensure compliance with regulatory requirements;<br />
• Continually improve its environmental performance; and<br />
• Satisfy the expectations of stakeholders and the local community.<br />
The EMS forms the basis of environmental management at <strong>Bengalla</strong> and includes a<br />
procedures, standards and management plans to ensure all regulatory requirements are<br />
met. This RLMP (and any subsequent revisions) will form part of the EMS.<br />
Table 2 lists the standards and procedures associated with the EMS and highlights those<br />
specifically relevant to rehabilitation, final void and mine closure (which are reproduced<br />
in Appendix B).<br />
Table 2<br />
EMS Standards & Procedures<br />
1. EMS<br />
Standard<br />
2. Environmental, Social<br />
and Cultural Impact<br />
Management<br />
Procedures<br />
1.1 Aspects and Impacts<br />
1.2 Objectives and Targets<br />
1.3 Risk Assessments<br />
1.4 Environmental Audits, Inspections and Non-Conformance<br />
Management (includes regulatory audits)<br />
1.5 Environmental Legislative Compliance<br />
1.6 Environmental Training<br />
1.7 Environmental Reporting<br />
1.8 Incident Reporting<br />
1.9 Communications (includes community and complaints<br />
management)<br />
1.10 Monitoring and Measurement*<br />
1.11 Annual Management Review of the EMS<br />
1.12 Document Control<br />
2.1<br />
Cultural Heritage Management (includes European and<br />
Aboriginal heritage)*<br />
3. Property Transaction 3.1 Property Transaction Guidelines (<strong>Rio</strong> <strong>Tinto</strong>)*<br />
4. Closure Planning 4.1 Closure Planning Guidelines*<br />
5. Rehabilitation 5.1 Rehabilitation*<br />
6. Waste Management<br />
6.1 Waste Management (includes hazardous and Group A waste)<br />
6.2 Coarse Rejects and Tailings Disposal<br />
Ref: 071025 bmc rehabilitation & landscape mp Page 5