Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia
Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia
Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Rehabilitation & Landscape<br />
Management Plan<br />
Condition Requirement Section<br />
(f)<br />
details of who is responsible for monitoring, reviewing, and<br />
implementing the plan.<br />
6.0<br />
The Final Void Management Plan must: 4.0<br />
(a) justify the planned final location and future use of the final void/s; 4.1<br />
35<br />
(b)<br />
incorporate design criteria and specifications for the final void/s<br />
based on verified groundwater modelling predictions and a reassessment<br />
of post-mining groundwater equilibration; and<br />
(c) describe what actions and measures would be implemented to: 4.3<br />
4.2<br />
• minimise any potential adverse impacts associated with the<br />
final void/s; and<br />
• manage and monitor the potential impacts of the final void/s<br />
until the <strong>Mining</strong> Lease for the development is relinquished.<br />
The Mine Closure Plan must: 5.0<br />
a) define the objectives and criteria for mine closure; 5.1<br />
36<br />
b) investigate options for the future use of the site, including any<br />
final void/s;<br />
c) describe the measures that would be implemented to minimise or<br />
manage the ongoing environmental effects of the development;<br />
and<br />
d) describe how the performance of these measures would be<br />
monitored over time.<br />
5.2<br />
5.4<br />
5.5<br />
This RLMP has been compiled generally in accordance with the Strategic Framework for<br />
Mine Closure (ANZMEC/MCA, 2000), Guidelines to <strong>Mining</strong>, Rehabilitation and<br />
Environmental Management Process (DPI, 2006) and <strong>Bengalla</strong>’s <strong>Mining</strong> Operations Plan<br />
(MOP) (2006).<br />
1.3 Management Plan Objective<br />
The primary objective of this RLMP is to address the requirements of DA 211/93 (M1)<br />
and to plan for rehabilitation and mine closure at <strong>Bengalla</strong> to satisfy regulatory and <strong>Rio</strong><br />
<strong>Tinto</strong> <strong>Coal</strong> <strong>Australia</strong> (RTCA) requirements.<br />
This RLMP includes preliminary details of the Final Void Management Plan and Mine<br />
Closure Plan based on existing and available information. This is consistent with the<br />
explanatory note included in Development Consent Condition 33 (Table 1) which allows<br />
for the subsequent revision of this RLMP to include a detailed Final Void Management<br />
Plan and Mine Closure Plan. As mining at <strong>Bengalla</strong> is currently planned and approved to<br />
continue for at least 10 years, a detailed Final Void Management Plan and Mine Closure<br />
Plan will be developed at least five years prior to mine closure.<br />
Ref: 071025 bmc rehabilitation & landscape mp Page 3