12.06.2014 Views

Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia

Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia

Bengalla Mining Company Pty Limited - Rio Tinto Coal Australia

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Rehabilitation & Landscape<br />

Management Plan<br />

Condition Requirement Section<br />

(f)<br />

details of who is responsible for monitoring, reviewing, and<br />

implementing the plan.<br />

6.0<br />

The Final Void Management Plan must: 4.0<br />

(a) justify the planned final location and future use of the final void/s; 4.1<br />

35<br />

(b)<br />

incorporate design criteria and specifications for the final void/s<br />

based on verified groundwater modelling predictions and a reassessment<br />

of post-mining groundwater equilibration; and<br />

(c) describe what actions and measures would be implemented to: 4.3<br />

4.2<br />

• minimise any potential adverse impacts associated with the<br />

final void/s; and<br />

• manage and monitor the potential impacts of the final void/s<br />

until the <strong>Mining</strong> Lease for the development is relinquished.<br />

The Mine Closure Plan must: 5.0<br />

a) define the objectives and criteria for mine closure; 5.1<br />

36<br />

b) investigate options for the future use of the site, including any<br />

final void/s;<br />

c) describe the measures that would be implemented to minimise or<br />

manage the ongoing environmental effects of the development;<br />

and<br />

d) describe how the performance of these measures would be<br />

monitored over time.<br />

5.2<br />

5.4<br />

5.5<br />

This RLMP has been compiled generally in accordance with the Strategic Framework for<br />

Mine Closure (ANZMEC/MCA, 2000), Guidelines to <strong>Mining</strong>, Rehabilitation and<br />

Environmental Management Process (DPI, 2006) and <strong>Bengalla</strong>’s <strong>Mining</strong> Operations Plan<br />

(MOP) (2006).<br />

1.3 Management Plan Objective<br />

The primary objective of this RLMP is to address the requirements of DA 211/93 (M1)<br />

and to plan for rehabilitation and mine closure at <strong>Bengalla</strong> to satisfy regulatory and <strong>Rio</strong><br />

<strong>Tinto</strong> <strong>Coal</strong> <strong>Australia</strong> (RTCA) requirements.<br />

This RLMP includes preliminary details of the Final Void Management Plan and Mine<br />

Closure Plan based on existing and available information. This is consistent with the<br />

explanatory note included in Development Consent Condition 33 (Table 1) which allows<br />

for the subsequent revision of this RLMP to include a detailed Final Void Management<br />

Plan and Mine Closure Plan. As mining at <strong>Bengalla</strong> is currently planned and approved to<br />

continue for at least 10 years, a detailed Final Void Management Plan and Mine Closure<br />

Plan will be developed at least five years prior to mine closure.<br />

Ref: 071025 bmc rehabilitation & landscape mp Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!