Environmental procedure EP 5.1<br />
responsible for the project. At <strong>Bengalla</strong>, prior consultation with the<br />
Environmental Section is required before disturbance;<br />
• a visual inspection will be conducted for Aboriginal artifacts. Any<br />
artifacts found will be managed in accordance with the relevant<br />
procedures;<br />
• a visual flora and fauna inspection will be conducted to monitor for<br />
threatened species and to identify fauna that might require relocation<br />
prior to clearing. Environmental Services will be notified of any issues<br />
arising from the inspection;<br />
• a visual assessment of the vegetation will be conducted to identify<br />
available seed and timber resources to be collected or removed;<br />
• an assessment will be made of the depth, volume and characteristics of<br />
the topsoil to be removed;<br />
• diversion banks and drains will be constructed to prevent soil erosion as<br />
required by CNA’s erosion and sediment control management plan;<br />
• contractors undertaking vegetation removal, topsoil stripping and<br />
overburden removal will be briefed on their environmental<br />
responsibilities.<br />
4.2 Vegetation Removal<br />
Vegetation, not required for other purposes, and rocks will be pushed into<br />
windrows located away from any standing trees.<br />
All grass will be left to be recovered with the topsoil.<br />
Trees and logs will be cut to a size manageable by the shovel. Following<br />
topsoil removal and blasting, this material will be pushed on to the pre-strip<br />
area for removal with the overburden.<br />
A watch will be maintained for Aboriginal objects during the clearing and<br />
soil removal operations. If any objects are encountered, clearing will cease<br />
in that area and the Manager Environmental Services will be notified.<br />
4.3 Soil Stripping<br />
Soil stripping will be to be undertaken in accordance with the <strong>Mining</strong><br />
Operations Plan.<br />
Topsoil will be stripped by bulldozer or scraper to the depth determined by<br />
the MOP or until subsoil is observed by the plant operator or supervisor.<br />
Guidance on stripping depth will be sought from the Specialist,<br />
Rehabilitation and Landcare if there is any uncertainty.<br />
Topsoil stripping will not be undertaken in windy conditions that will cause<br />
excessive dust to be generated (see EP 8.2 Dust Management, Mobile<br />
Equipment).<br />
The water content of the soil to be stripped is an important consideration:<br />
title<br />
EP 5.1<br />
REHABILITATION<br />
date issued<br />
3/8/04<br />
revision status<br />
1.3<br />
date reviewed<br />
20/1/05<br />
Printed documents are uncontrolled. Check the <strong>Coal</strong> & Allied Intranet for the latest version of this document.<br />
page<br />
2 of 8