13.06.2014 Views

Wyoming Framework Water Plan - Living Rivers Home Page

Wyoming Framework Water Plan - Living Rivers Home Page

Wyoming Framework Water Plan - Living Rivers Home Page

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8.0 OPPORTUNITIES<br />

Table 8-20 Evaluated Short List: Crazy Woman Creek Basin<br />

Est. Yield,<br />

Capacity,<br />

or<br />

Depletion 1<br />

Project Type 3 ac-ft<br />

<strong>Water</strong><br />

Availability<br />

Financial<br />

Feasibility<br />

Project Evaluation Criteria 2<br />

Public<br />

Acceptance<br />

No. of<br />

Sponsors/<br />

Beneficiaries<br />

Legal/<br />

Institutional<br />

Environmental/<br />

Recreation<br />

Benefits<br />

TOTAL<br />

SCORE<br />

Type 1 (None)<br />

Type 2 6 7 5 6 4 3<br />

Hazelton <strong>Water</strong>shed Site "B" 3,000 acres 5 7 5 7 4 4 174<br />

Doyle Creek Reservoir 3,000 acres 5 7 5 7 4 4 174<br />

Hazelton <strong>Water</strong>shed Site "A" 1,580 acres 7 5 6 5 3 3 158<br />

Type 3 6 8 5 6 5 6<br />

Crazy Woman Reservoir 10,500 y 7 6 6 6 5 5 211<br />

Lower Crazy Woman Reservoir 67,200 y 7 4 6 7 4 6 202<br />

North Fork Crazy Woman Reservoir 2,759 c 6 5 5 4 6 4 179<br />

Enl. Negro Creek Reservoir 13,900 c 7 5 5 5 3 4 176<br />

Groundwater Development unk 4 3 7 3 6 5 161<br />

Type 4 (None)<br />

1 y = yield, c = capacity, d = depletion, unk = unknown<br />

Each criterion has a different weighting for each type of project; 10 is most important, 1 is least important. Weighting factors are shown in bold.<br />

2<br />

Under each project, the criteria are individually scored; 10 means largely favorable, 0 is unfavorable.<br />

Total scores are the additive result of multiplying each project criteria weighting by the associated project type criteria score.<br />

Type 1: Rehabilitation projects that preserve existing uses<br />

3<br />

Type 2: Projects that rectify existing shortages<br />

Type 3: Projects that meet projected future demands<br />

Type 4: Projects that enhance uses in other <strong>Wyoming</strong> basins<br />

8-40<br />

8-40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!