13.06.2014 Views

Wyoming Framework Water Plan - Living Rivers Home Page

Wyoming Framework Water Plan - Living Rivers Home Page

Wyoming Framework Water Plan - Living Rivers Home Page

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8.0 OPPORTUNITIES<br />

Table 8-21 Evaluated Short List: Powder River Basin<br />

Type 1 (None)<br />

Est. Yield,<br />

Capacity,<br />

or<br />

Depletion 1<br />

Project Type 3 ac-ft<br />

<strong>Water</strong><br />

Availability<br />

Financial<br />

Feasibility<br />

Project Evaluation Criteria 2<br />

Public<br />

Acceptance<br />

No. of<br />

Sponsors/<br />

Beneficiaries<br />

Legal/<br />

Institutional<br />

Environmental/<br />

Recreation<br />

Benefits<br />

Type 2 6 7 5 6 4 3<br />

Morgareidge No. 7 Reservoir 4,600 acres 5 6 5 7 4 4 167<br />

Red Fork Powder River Reservoir unk 4 4 5 6 4 4 141<br />

Type 3 6 8 5 6 5 6<br />

Moorhead Reservoir 35,000 y 8 7 7 6 5 6 236<br />

Buffalo Creek Reservoir unk 8 3 7 6 7 6 214<br />

Pumpkin Reservoir 60,000 y 6 6 6 6 6 5 210<br />

Clarks Fork Exchange 99,700 c 8 6 6 5 3 6 207<br />

Bass Industrial Reservoir 123,380 c 6 6 6 5 5 5 199<br />

Arvada Reservoir 35,000 y 6 6 6 5 5 5 199<br />

Middle Fork Powder River Reservoir 27,000 y 5 5 5 6 7 5 196<br />

Fence Creek Reservoir 106,700 c 7 4 7 5 6 4 193<br />

Fortification Creek Reservoir 63,300 y 5 4 7 6 6 4 187<br />

Gibbs Reservoir 10,800 y 6 5 6 4 5 5 185<br />

Groundwater Development unk 3 3 7 3 6 5 155<br />

Type 4 (None)<br />

TOTAL<br />

SCORE<br />

1 y = yield, c = capacity, d = depletion, unk = unknown<br />

Each criterion has a different weighting for each type of project; 10 is most important, 1 is least important. Weighting factors are shown in bold.<br />

2<br />

Under each project, the criteria are individually scored; 10 means largely favorable, 0 is unfavorable.<br />

Total scores are the additive result of multiplying each project criteria weighting by the associated project type criteria score.<br />

Type 1: Rehabilitation projects that preserve existing uses<br />

3<br />

Type 2: Projects that rectify existing shortages<br />

Type 3: Projects that meet projected future demands<br />

Type 4: Projects that enhance uses in other <strong>Wyoming</strong> basins<br />

8-41<br />

8-41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!