3100B HFOV Operator Manual - CareFusion
3100B HFOV Operator Manual - CareFusion
3100B HFOV Operator Manual - CareFusion
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Operator</strong>’s <strong>Manual</strong> 67<br />
CAUTION<br />
The cover enclosing the Control Package, Column, or any other portion of the ventilator must not be removed by<br />
the user. To avoid electrical shock hazard, please refer all service requiring cover removal to a qualified<br />
biomedical equipment service technician.<br />
DC Power Supply Calibration<br />
The calibration procedure for the Control Package DC Power Supply is as follows:<br />
1. Turn off Power to the <strong>3100B</strong> <strong>HFOV</strong> and unplug unit from AC receptacle.<br />
2. Remove the rear column cover.<br />
3. Plug the <strong>3100B</strong> <strong>HFOV</strong> back into receptacle and turn on Power.<br />
4. Refer to Figure 8.2 to locate screwdriver potentiometer settings R9, R57, and R82 for the<br />
DC Power Supply. It is located immediately below the oscillator drive electronics.<br />
Note<br />
Figure 8.2. Power Supply Adjustment Potentiometers.<br />
5. Connect the negative lead of a digital voltmeter to the +5V Com terminal of the DC<br />
Power Supply.<br />
6. Connect the positive lead of the digital voltmeter to the +5V terminal of the DC Power<br />
Supply.<br />
If adjustments are necessary, remove the front column cover.<br />
767164–101 Rev. R