All works carried out shall comply with Rules, Bye-laws, and regulations in force. All testing fees for<br />

materials as required shall be borne by the Contractor only.<br />

13. All formalities such as obtaining approvals for water supply, drainage and fire fighting installations,<br />

getting the works inspected or tested in the presence of concerned officials obtaining completion<br />

certificates for the installation and final connection of water supply and drainage for the building<br />

shall be the responsibility of the Contractor and no extra payment shall be payable to the Contractor<br />

on this account.<br />

14. The work of plumbing and drainage shall be carried out by skilled plumbers in line and level as<br />

instructed and as per good engineering practice.<br />

15. The holes in walls, RCC members, etc. shall be made very carefully after prior permission of the<br />

authorized officer of the Corporation before laying necessary pipe lines and the same shall be made<br />

good as per the surrounding surface without any extra cost, as per the satisfaction of the authorized<br />

officer.<br />

16. The Corporation can omit or add item. Any extra item of to be carried out, the rate for the same<br />

shall be decided by the Authorized Officer of the Corporation.<br />

17. All the fittings of external pipes and sanitary ware shall be fitted in such a way that they shall be<br />

absolutely water tight.<br />

18. All the fittings and fixtures shall be of I.S.I/ Approved make.<br />

Authorised Officer<br />

<strong>IDCO</strong><br />