25. The Contractor will have to arrange for water supply and electricity at his own cost for all<br />

works and make sanitary arrangements for his workmen employed at his own cost for his labour<br />

camps. Contractor has to arrange adequate lighting arrangements for night work whenever<br />

necessary at his own cost.<br />

26. The tenderer shall have to abide by the C.P.W.D. Safety Code introduced by the<br />

Government of India, Ministry of Works Housing and Supply in their standard order No.44250<br />

Dt.25.11.57.<br />

27. The Corporation will have the right to supply at any time in the interest of work any Deptt.<br />

materials to be used in the work in addition to those mentioned in Clause-IC(b) conditions of<br />

contract and the Contractor shall use such materials without any controversy or dispute on that<br />

account. The rates of such materials will be at the stock issue rates fixed by the Corporation plus<br />

storage charges or market rates prevailing at the time of supply whichever is higher.<br />

28. The Contractor will be responsible for the loss or damage if any, departmental materials,<br />

equipment’s supplied to him under condition No.9 of the General Conditions and No.35 of the<br />

Special Conditions of Contract during execution of work due to any reasons whatsoever and the<br />

cost of such materials will be recovered from him at the prevailing stock issue rates plus storage<br />

charges or market rates whichever is higher.<br />

29. When any items of work not specifically covered by the accepted tender or contract, is to<br />

be executed, it can be taken up departmentally or through any other agency as the Corporation fees<br />

fit.<br />

30. In selection of fittings/ glazed tiles, stone/ grills/ paints etc., the decision of the<br />

Corporation is final in regard to quality, make, shade etc.<br />

31. No part of the contract shall be sublet without written permission of the Corporation or<br />

transfer be made by Power of Attorney authorising others to receive payment on the Contractor’s<br />

behalf.<br />

32. Under no circumstances interest is chargeable for the dues or additional dues if any<br />

payable for the work. (As per Orissa Works Department’s letter No.3662 Dt.20.12.79).<br />

33. The Contractor shall make all arrangements at his own cost for proper storage of<br />

materials and guarding the same.<br />

34. The Corporation reserves the right to delete any item of work incorporated in this<br />

agreement from the scope of the contract and execute the same either departmentally or through<br />

other agency, without assigning any reason thereof. Such deletion shall not invalidate the contract<br />

and no monetary compensation whatsoever shall be paid to the Contractor in this regard.<br />

35. The Contractor shall carry out all the required tests for the works at his own cost in the manner<br />

prescribed in relevant I.S. Codes. The tests should be done in presence of the authorised person of<br />

the Corporation or his sub-ordinate and duly certified by him regarding the correctness of the tests.<br />

57