shall not preclude the requiring of bad, unsound and imperfect or unskilled work to be removed and taken<br />

away and reconstructed or re-erected, or be considered as an admission of the due performance of the<br />

contract, or any part thereof in any respect, or the accrual of any claim nor shall it conclude, determine or<br />

effect in any way the powers of the corporation under these conditions or any of them as to the final<br />

settlement or adjustment of the accounts or otherwise, or in any other way vary or affect the contract.<br />

Payment to the contractor will be made in a regular basis subjected to availability of funds from client.<br />

CLAUSE - VIII :<br />

The final bill shall be prepared by the officer of the Orissa Industrial Infrastructure Development<br />

Corporation in accordance with the rules of the Corporation in the presence of the Contractor within three<br />

month of the date of completion.<br />

CLAUSE - IX :<br />

STORES SUPPLIED BY CORPORATION :<br />

Deleted<br />

CLAUSE - X :<br />

WORKS TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATION, DRAWING AND ORDERS<br />

ETC. :<br />

The Contractor shall execute the whole and every of the work in the most substantial and workman like<br />

manner, and both as regards materials and otherwise in every respect in strict accordance with the<br />

specification. The Contractor shall also conform exactly, fully and faithfully to the designs drawing and<br />

instructions in writing relating to the work signed by the authorised officer of the Corporation lodged in his<br />

office, and to which the Contractor shall be entitled to have access at such office, for the purpose of<br />

inspection during office hours and the Contractor shall, if he so require, be entitled at his own expenses<br />

to make or cause to be made copies of the specifications, and of all such designs, drawings and<br />

instructions as aforesaid.<br />

CLAUSE - XI :<br />

DO NOT INVALIDATE CONTRACTS :<br />

The authorized officer of the Corporation shall have power to make any alterations minor addition to the<br />

original specifications drawings, designs and instructions, that may appear to him necessary and<br />

advisable during the progress of work and the Contractor shall be bound to carry out the work in<br />

accordance with any instructions which may be given to him writing signed by the authorized officer of<br />

the Corporation and such alteration shall not invalidate the contract and any additional work which the<br />

Contractor may be directed to do in the manner above specified as part of the work shall be carried out<br />

by the Contractor on the same conditions in all respects on which he agreed to do the main work, and at<br />

the same rates as are specified in the tender for the main work.<br />

40