(a) The approach to the construction site is accessible and relatively free for plying of materials, transport<br />
vehicles as well as vehicle of workers/ supervisors and inspecting officials.<br />
(b) During dry weather, regular sprinkling of water is done in the construction areas to ensure control of<br />
suspended particles like dust etc.<br />
(c) The construction materials like bricks/ laterite stone/ metal/ chips/ steel rods/ sand etc. are stacked/<br />
stored in proper manner in identified locations. Cement is stored in a proper shed as per BIS Code.<br />
(d) Construction water/ seepage water is properly drained out to avoid water logging in the construction<br />
areas.<br />
(e) Solid waste/ debris are collected and dumped at identified locations before disposal thereof at<br />
designated places/ areas. This location is barricaded so as to ensure that the waste materials like, broken<br />
glass, pointed nails, steel scraps with sharp edge etc. do not cause physically injuries to the workers or<br />
supervisor or visitors.<br />
(f) Reusable materials like empty containers, empty cement bags, wooden/ steel centering, shuttering<br />
plates/ planks etc. are properly stacked for carrying those to other construction sites/ Central Stores.<br />
(g) The vehicles which carry debris/ excess earth etc. from the construction sites are not allowed to be over<br />
loaded nor these vehicles are allowed to speed up beyond a given speed limit so as to ensure that these<br />
materials do not get spilled during transportation and thereby pollute the atmosphere.<br />
(h) Dug-up areas/ pits, openings on upper floors are properly barricaded to avoid accident to workers/<br />
others.<br />
(i) Provision is made for safe drinking water at the construction site for use by the labourers and other<br />
persons working/ supervising works there.<br />
(j) Wastage of construction water is avoided.<br />
(k) As far as practicable dust-preventing masks, safety belts and helmets, industrial gloves etc. are<br />
provided to the workers to avoid possible accidents and physical injuries to them.<br />
(l) First Aid Box is kept to attend to minor injuries immediately.<br />
(m) The address and telephone numbers of the nearest Police Station, Fire Brigade and Hospital are<br />
recorded on a display board for information of all concerned.<br />
The Contractor should take all necessary steps as mentioned above without any additional claim to<br />
the Corporation.<br />
61<br />
Sd/-<br />
Divisional Head,<br />
<strong>IDCO</strong>,Berhampur.