(a) The approach to the construction site is accessible and relatively free for plying of materials, transport<br />

vehicles as well as vehicle of workers/ supervisors and inspecting officials.<br />

(b) During dry weather, regular sprinkling of water is done in the construction areas to ensure control of<br />

suspended particles like dust etc.<br />

(c) The construction materials like bricks/ laterite stone/ metal/ chips/ steel rods/ sand etc. are stacked/<br />

stored in proper manner in identified locations. Cement is stored in a proper shed as per BIS Code.<br />

(d) Construction water/ seepage water is properly drained out to avoid water logging in the construction<br />

areas.<br />

(e) Solid waste/ debris are collected and dumped at identified locations before disposal thereof at<br />

designated places/ areas. This location is barricaded so as to ensure that the waste materials like, broken<br />

glass, pointed nails, steel scraps with sharp edge etc. do not cause physically injuries to the workers or<br />

supervisor or visitors.<br />

(f) Reusable materials like empty containers, empty cement bags, wooden/ steel centering, shuttering<br />

plates/ planks etc. are properly stacked for carrying those to other construction sites/ Central Stores.<br />

(g) The vehicles which carry debris/ excess earth etc. from the construction sites are not allowed to be over<br />

loaded nor these vehicles are allowed to speed up beyond a given speed limit so as to ensure that these<br />

materials do not get spilled during transportation and thereby pollute the atmosphere.<br />

(h) Dug-up areas/ pits, openings on upper floors are properly barricaded to avoid accident to workers/<br />

others.<br />

(i) Provision is made for safe drinking water at the construction site for use by the labourers and other<br />

persons working/ supervising works there.<br />

(j) Wastage of construction water is avoided.<br />

(k) As far as practicable dust-preventing masks, safety belts and helmets, industrial gloves etc. are<br />

provided to the workers to avoid possible accidents and physical injuries to them.<br />

(l) First Aid Box is kept to attend to minor injuries immediately.<br />

(m) The address and telephone numbers of the nearest Police Station, Fire Brigade and Hospital are<br />

recorded on a display board for information of all concerned.<br />

The Contractor should take all necessary steps as mentioned above without any additional claim to<br />

the Corporation.<br />

61<br />

Sd/-<br />

Divisional Head,<br />

<strong>IDCO</strong>,Berhampur.