GENERAL CONDITION<br />

1. Validity of Offer : The tender submitted by the tenderer shall remain valid for acceptance for<br />

a period of 120<br />

of tender.<br />

days (One hundred twenty) days from the date of opening<br />

2. Scope of Supply : Supply of Maxphalt, Cement, & Rod shall be the responsibility of the<br />

3. Measurement of<br />

reinforcement<br />

steel<br />

contractor and the same will be used in the construction after getting the<br />

test certificate and approval by the concerned Divisional Head, <strong>IDCO</strong>.<br />

: Measurement of reinforcement steel will be done as per ISI standard<br />

weight. Nothing extra will be paid for rolling margin.<br />

4. Testing All cost of mandatory testing of Aggregates, Moorum, sand, cement,<br />

Maxphalt, concrete cubes, metals compaction, moorum compaction testing<br />

and other construction materials etc. will be borne by the Contractor.<br />

5. Agreement On acceptance of tender, the successful tenderer will have to execute<br />

agreement with latest addition and alternation made till the date of opening<br />

of the tender paper in non-judicial stamp paper of Rs.100.00 and six<br />

cartridge papers, which is to be given by the tenderer to the concerned<br />

Divisional Head of <strong>IDCO</strong>.<br />

6. The Contractor shall have to arrange water and power himself so as to<br />

execute the work as per time schedule. Nothing extra will be paid on this<br />

account.<br />

7. The Contractor has to make his own arrangement for approach road to the<br />

work site.<br />

8. The consumption of Maxphalt, Cement will be calculated as per<br />

Government of Orissa Analysis of Rate.<br />

9. The Contractor has to make his own arrangement for keeping Maxphalt/<br />

cement in his store / site. Watch and ward is to be maintained by the<br />

Contractor.<br />

10 The Engineer-in-charge or his representative reserves the right to check<br />

the store at any time. The Contractor has to maintain a proper stock book<br />

showing daily consumption and balance etc.<br />

(Total ten numbers)<br />