GENERAL CONDITION<br />
1. Validity of Offer : The tender submitted by the tenderer shall remain valid for acceptance for<br />
a period of 120<br />
of tender.<br />
days (One hundred twenty) days from the date of opening<br />
2. Scope of Supply : Supply of Maxphalt, Cement, & Rod shall be the responsibility of the<br />
3. Measurement of<br />
reinforcement<br />
steel<br />
contractor and the same will be used in the construction after getting the<br />
test certificate and approval by the concerned Divisional Head, <strong>IDCO</strong>.<br />
: Measurement of reinforcement steel will be done as per ISI standard<br />
weight. Nothing extra will be paid for rolling margin.<br />
4. Testing All cost of mandatory testing of Aggregates, Moorum, sand, cement,<br />
Maxphalt, concrete cubes, metals compaction, moorum compaction testing<br />
and other construction materials etc. will be borne by the Contractor.<br />
5. Agreement On acceptance of tender, the successful tenderer will have to execute<br />
agreement with latest addition and alternation made till the date of opening<br />
of the tender paper in non-judicial stamp paper of Rs.100.00 and six<br />
cartridge papers, which is to be given by the tenderer to the concerned<br />
Divisional Head of <strong>IDCO</strong>.<br />
6. The Contractor shall have to arrange water and power himself so as to<br />
execute the work as per time schedule. Nothing extra will be paid on this<br />
account.<br />
7. The Contractor has to make his own arrangement for approach road to the<br />
work site.<br />
8. The consumption of Maxphalt, Cement will be calculated as per<br />
Government of Orissa Analysis of Rate.<br />
9. The Contractor has to make his own arrangement for keeping Maxphalt/<br />
cement in his store / site. Watch and ward is to be maintained by the<br />
Contractor.<br />
10 The Engineer-in-charge or his representative reserves the right to check<br />
the store at any time. The Contractor has to maintain a proper stock book<br />
showing daily consumption and balance etc.<br />