Competitive<br />

Dialogue and<br />

Negotiated<br />

Negotiated<br />

Accelerated<br />

Notes:<br />

date invitation sent<br />

Minimum time for receipt <strong>of</strong> requests to<br />

participate from date contract notice sent<br />

Minimum time for receipt <strong>of</strong> requests to<br />

participate from date contract notice sent<br />

37<br />

15<br />

a) The time period starts on the day the notice is despatched to the OJEU, not the date<br />

when it is actually published. If the last day is a Saturday, Sunday or public holiday<br />

then the receipt or closing date will be the first ordinary working day thereafter.<br />

b) PIN = Prior Information Notice.<br />

7 CONTRACT DOCUMENTATION<br />

Once the contracting authority has established that the proposed contract falls within the<br />

remit <strong>of</strong> one <strong>of</strong> the Regulations, and has selected which procedure to use, the contract must<br />

be advertised and documentation prepared, paying special attention to the technical<br />

specification and selection criteria.<br />

7.1 Advertising Requirements<br />

The Open, Restricted and, where applicable, Negotiated procedures require that the<br />

contracting authority places a notice in the OJEU, stating its intention to seek <strong>of</strong>fers in<br />

respect <strong>of</strong> the perceived need. The notice must take into account the timescales detailed in<br />

Table 2 above.<br />

It is important that the maximum anticipated duration <strong>of</strong> the contract is stated in the notice.<br />

For example, if the expected duration is 3 years but there is a possibility that it could be<br />

extended to 5 years, then state “up to 5 years” in the notice. The circumstances under which<br />

a contract extension might be granted can then be described with more precision in the<br />

invitation to tender document.<br />

The contracting authority cannot advertise the contract in its local or national press<br />

before the notice has been despatched to the OJEU. The advertisement must not contain any<br />

more information than is contained in the OJEU notice.<br />

7.2 Technical Specifications<br />

When preparing the documentation it is necessary to ensure that the specifications for the<br />

product are non-discriminatory. In particular, the specification must not be based upon the<br />

specification <strong>of</strong> an existing product from one supplier. This would be in breach <strong>of</strong> the<br />

regulations and is likely to invite challenges from other suppliers. If the requirement can<br />

only be expressed by reference to a brand or proprietary name, then the name must be<br />

accompanied by the words “or equivalent”.<br />

Purchasing Procedures December 2011