13.10.2014 Views

PURCHASING PROCEDURES - University of Central Lancashire

PURCHASING PROCEDURES - University of Central Lancashire

PURCHASING PROCEDURES - University of Central Lancashire

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

POLICY<br />

2.0 Principles<br />

2.1 All consultancies will be expected to adhere to a pr<strong>of</strong>essional Code <strong>of</strong> Practice<br />

This will be either the MCA (Management Consultancies Association) Code <strong>of</strong><br />

Pr<strong>of</strong>essional Conduct or equivalent 1 . Additionally all consultancies shall adhere to<br />

the <strong>University</strong>‟s policies on diversity and equal opportunities in all work and not just<br />

such work which has diversity as an explicit element <strong>of</strong> the brief.<br />

2.2 All consultancies will be appropriately commissioned.<br />

This means that all commissions will be consistent with the <strong>University</strong>‟s Financial<br />

Regulations and will normally incorporate the model contract for consultants issued<br />

by Financial Services.<br />

2.3 All consultancies will have a clear brief<br />

This means that all consultancies will have as a minimum a written statement <strong>of</strong><br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

The scope <strong>of</strong> the work with relevant terms appropriately defined<br />

The methodologies and instruments to be used (e.g. survey, interview, focus group<br />

etc)<br />

In the case <strong>of</strong> survey work the population from which the sample will be drawn and<br />

the sampling frame.<br />

A stated link to <strong>University</strong> Strategy (e.g. Corporate Plan, Risk Register, VFM<br />

schedule or equivalent), and previous relevant documents and research work where<br />

known.<br />

Who is commissioning the consultancy and to whom the outputs should be delivered<br />

in the first instance<br />

The nature <strong>of</strong> the outputs (reports, presentations etc)<br />

The time frame for final report and any intermediate drafts to be delivered<br />

Utilising the Standard Contract for the Purchase <strong>of</strong> Consultancy will cover all <strong>of</strong> the<br />

above requirements.<br />

2.4 All quantitative surveys will be reliable, valid and appropriately executed and<br />

reported.<br />

This means that<br />

<br />

<br />

<br />

Survey questions will adhere to social science good practice and questions or items<br />

should be both reliable and valid.<br />

Appropriate confidentiality and informed consent must be exercised.<br />

Statistical analysis should be decided prior to data collection.<br />

1 http://www.mca.org.uk/MCA/AboutUs/CodeOfConduct.aspx<br />

Purchasing Procedures December 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!