PURCHASING PROCEDURES - University of Central Lancashire
PURCHASING PROCEDURES - University of Central Lancashire
PURCHASING PROCEDURES - University of Central Lancashire
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
POLICY<br />
2.0 Principles<br />
2.1 All consultancies will be expected to adhere to a pr<strong>of</strong>essional Code <strong>of</strong> Practice<br />
This will be either the MCA (Management Consultancies Association) Code <strong>of</strong><br />
Pr<strong>of</strong>essional Conduct or equivalent 1 . Additionally all consultancies shall adhere to<br />
the <strong>University</strong>‟s policies on diversity and equal opportunities in all work and not just<br />
such work which has diversity as an explicit element <strong>of</strong> the brief.<br />
2.2 All consultancies will be appropriately commissioned.<br />
This means that all commissions will be consistent with the <strong>University</strong>‟s Financial<br />
Regulations and will normally incorporate the model contract for consultants issued<br />
by Financial Services.<br />
2.3 All consultancies will have a clear brief<br />
This means that all consultancies will have as a minimum a written statement <strong>of</strong><br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
The scope <strong>of</strong> the work with relevant terms appropriately defined<br />
The methodologies and instruments to be used (e.g. survey, interview, focus group<br />
etc)<br />
In the case <strong>of</strong> survey work the population from which the sample will be drawn and<br />
the sampling frame.<br />
A stated link to <strong>University</strong> Strategy (e.g. Corporate Plan, Risk Register, VFM<br />
schedule or equivalent), and previous relevant documents and research work where<br />
known.<br />
Who is commissioning the consultancy and to whom the outputs should be delivered<br />
in the first instance<br />
The nature <strong>of</strong> the outputs (reports, presentations etc)<br />
The time frame for final report and any intermediate drafts to be delivered<br />
Utilising the Standard Contract for the Purchase <strong>of</strong> Consultancy will cover all <strong>of</strong> the<br />
above requirements.<br />
2.4 All quantitative surveys will be reliable, valid and appropriately executed and<br />
reported.<br />
This means that<br />
<br />
<br />
<br />
Survey questions will adhere to social science good practice and questions or items<br />
should be both reliable and valid.<br />
Appropriate confidentiality and informed consent must be exercised.<br />
Statistical analysis should be decided prior to data collection.<br />
1 http://www.mca.org.uk/MCA/AboutUs/CodeOfConduct.aspx<br />
Purchasing Procedures December 2011