29.10.2014 Views

RED-D-ARC DC-600

RED-D-ARC DC-600

RED-D-ARC DC-600

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

F-3<br />

DIAGRAMS<br />

F-3<br />

CONNECTION OF LN-7 TO THE CV-655, <strong>DC</strong>-655 OR <strong>DC</strong>-<strong>600</strong> POWER SOURCE<br />

14-PIN<br />

RECEPTACLE<br />

POWER SOURCE<br />

CONTROL CABLE<br />

FOR CONTROL CABLE<br />

WITH 14 PIN MS-TYPE<br />

PLUG CONNECTOR<br />

Do not operate with covers removed.<br />

Disconnect power source before<br />

servicing.<br />

21<br />

LN-7 TO INPUT<br />

CABLE PLUG<br />

LN-7 CONTROL<br />

CABLE<br />

OR<br />

FOR CONTROL CABLE<br />

WITH TERMINAL STRIP<br />

LEAD CONNECTORS<br />

Do not touch electrically live parts.<br />

Only qualified persons should install, use or<br />

service this machine.<br />

+21<br />

-<br />

N.F.<br />

21<br />

41 4 2 31 32 75 76 77<br />

N.B. & N.C.<br />

NEGATIVE POSITIVE<br />

N.D.<br />

N.E.<br />

32<br />

31<br />

2<br />

4<br />

GND<br />

21<br />

N.A. Welding cables must be of proper capacity for the current and<br />

duty cycle of immediate and future applications. See LN-7<br />

Operating Manual for proper sizes.<br />

N.B. If LN-7 is equipped with a meter kit, extend LN-7 control cable<br />

lead #21 from control cable with terminal strip connectors or from<br />

14-pin receptacle using #14 AWG or larger insulated wire physically<br />

suitable for the installation. An S16586-[LENGTH] remote<br />

voltage sensing work lead may be ordered for this purpose.<br />

Connect it directly to the work piece independent of the welding<br />

work cable connection. For convenience, this extended #21 lead<br />

should be taped to the welding work lead. (If the length of<br />

welding work cable is short, less than 25 feet, and connections<br />

can be expected to be reliable, then control cable lead #21 does<br />

not need to be extended and can be directly connected to<br />

terminal #21 on the terminal strip. Note that this is not the<br />

preferred connection because it adds error to the LN-7 voltmeter<br />

reading.)<br />

N.G.<br />

N.C. Tape up bolted connection if lead #21 is extended.<br />

ELECTRODE CABLE<br />

TO WIRE FEED UNIT<br />

N.A.<br />

N.D. Connect the control cable ground lead to the frame terminal<br />

marked near the power source terminal strip. The power<br />

source grounding terminal (marked and located near the power<br />

source input power connections) must be properly connected to<br />

electrical ground per the power source operating manual.<br />

TO WORK<br />

N.E. If an optional remote voltage control is used, connect it to<br />

this terminal strip.<br />

REMOTE VOLTAGE SENSING LEAD<br />

Above diagram shows electrode connected positive. To change polarity,<br />

turn power off, reverse the electrode and work leads at the power<br />

source and position the switch on wire feeder (if equipped )<br />

to proper polarity. Also refer to note N.F.<br />

N.F. If lead #21 is to be connected to the terminal strip,<br />

connect to the #21 terminal that matches work polarity. This<br />

connection must be changed whenever the electrode polarity is<br />

changed.<br />

N.G. Illustration does not necessarily represent actual position of<br />

appropriate output studs. Refer to power source operating manual<br />

for more information.<br />

For proper setting of switches on power source,<br />

see power source operating manual.<br />

10-30-98F<br />

S22976<br />

<strong>DC</strong>-<strong>600</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!