The Effect of Peening on the Fatigue Life of 7050 Aluminium Alloy
The Effect of Peening on the Fatigue Life of 7050 Aluminium Alloy
The Effect of Peening on the Fatigue Life of 7050 Aluminium Alloy
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DSTO-RR-0208<br />
Y470 X19 pocket<br />
Peened<br />
Previously<br />
N<strong>on</strong>-peened<br />
regi<strong>on</strong><br />
Repair as per<br />
documentati<strong>on</strong>.<br />
Maintain <strong>on</strong> Safe <strong>Life</strong><br />
Determine depth <str<strong>on</strong>g>of</str<strong>on</strong>g> material<br />
to be removed to ensure c<strong>on</strong>fident<br />
removal <str<strong>on</strong>g>of</str<strong>on</strong>g> cracks, Figure 33<br />
Based <strong>on</strong> NDI threshold<br />
and FE analysis.<br />
Requiring less than<br />
500micr<strong>on</strong>s for Safe <strong>Life</strong><br />
Requiring greater than<br />
500micr<strong>on</strong>s for Safe <strong>Life</strong><br />
Repair (full cut) as<br />
per documentati<strong>on</strong>.<br />
Maintain <strong>on</strong> Safe <strong>Life</strong><br />
Repair (full cut) as<br />
per documentati<strong>on</strong>.<br />
Maintain <strong>on</strong> Safe <strong>Life</strong><br />
Repair (cut to NDI<br />
limit) Maintain <strong>on</strong><br />
Safety-by-Inspecti<strong>on</strong><br />
Figure 34: Summary <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>the</strong> proposed DSTO Y470 X19 pocket repair process. In <strong>the</strong> RAAF fleet <strong>the</strong><br />
X-19 pocket has not previously been peened. <str<strong>on</strong>g>The</str<strong>on</strong>g> 500µm (0.02 inch) LPI limit is based <strong>on</strong><br />
current AAP NDI limitati<strong>on</strong>s.<br />
<str<strong>on</strong>g>The</str<strong>on</strong>g> complete details <str<strong>on</strong>g>of</str<strong>on</strong>g> this repair specificati<strong>on</strong> are present in a report by (Sharp, Barter and<br />
Clark, 2000). <str<strong>on</strong>g>The</str<strong>on</strong>g> report allows <strong>the</strong> RAAF to assess <strong>the</strong> status <str<strong>on</strong>g>of</str<strong>on</strong>g> each aircraft and determine<br />
future repair times or replacement times.<br />
44