2030 Plan - Grand Strand Water and Sewer Authority
2030 Plan - Grand Strand Water and Sewer Authority
2030 Plan - Grand Strand Water and Sewer Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
timber sales, engineering fees <strong>and</strong> miscellaneous fees. GSWSA has three classes of<br />
water <strong>and</strong> wastewater customers: wholesale, residential <strong>and</strong> commercial. The following<br />
chart depicts GSWSA revenues for the last three fiscal years.<br />
GSWSA did not<br />
increase retail water<br />
<strong>and</strong> retail wastewater<br />
rates in 2009. It did<br />
increase wholesale<br />
water rates by 5.5%<br />
from $.73 to $.77 <strong>and</strong><br />
wholesale wastewater<br />
rates were increased by<br />
various percentages as<br />
specified by contract.<br />
During 2008, GSWSA<br />
increased retail water<br />
rates by 3.9% <strong>and</strong> retail<br />
wastewater rates by<br />
5.5%. It also<br />
increased wholesale water rates by 7.35% from $.68 to $.73 <strong>and</strong> wholesale wastewater<br />
rates increased by various percentages as specified by contract. During fiscal year 2007,<br />
GSWSA did not increase retail water or wastewater rates. However, it did increase<br />
wholesale water rates by 6.3% from $.64 to $.68 <strong>and</strong> wholesale wastewater rates<br />
by various percentages as specified by contract.<br />
2. Operating Expenses<br />
GSWSA operates <strong>and</strong> maintains a potable water treatment <strong>and</strong> distribution system <strong>and</strong> a<br />
wastewater collection <strong>and</strong> treatment system. The water production occurs at its 40 <strong>and</strong><br />
45 million gallon per day surface water treatment plants. GSWSA has backup wells to<br />
use for peak management. The wastewater system includes nine wastewater treatment<br />
plants that range in size from 10,000 gallons per day to 19.5 million gallons per day.<br />
Total operating expenses of GSWSA increased approximately $7.2 million over fiscal<br />
year 2009, <strong>and</strong> operating revenues decreased by approximately $2.4 million. Operating<br />
expenses for water <strong>and</strong> wastewater operations for the last three years are listed below:<br />
Personnel costs increased $1,628,287 or 11.3% from 2008 to 2009. GSWSA granted an<br />
26