TCAEY-THAEY 115÷238 - Rhoss
TCAEY-THAEY 115÷238 - Rhoss
TCAEY-THAEY 115÷238 - Rhoss
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
0 OFF<br />
I ON<br />
<strong>TCAEY</strong>-<strong>THAEY</strong> 133÷233<br />
dimensions and footprints<br />
<strong>TCAEY</strong> – <strong>THAEY</strong> 133÷233 dimensions and footprints, Standard, P1 – P2, ASP1 – ASP2 installation<br />
p<br />
6 6<br />
c<br />
a<br />
1<br />
2 3<br />
8<br />
l<br />
5<br />
e<br />
9<br />
11<br />
14<br />
17<br />
12<br />
10 o<br />
4 4<br />
13<br />
n<br />
15<br />
16<br />
7 7<br />
m l<br />
b<br />
f<br />
d<br />
g h<br />
i<br />
Model a b c d e f g h i l m n o p<br />
133 mm 1660 1710 1000 1045 1570 75 273 1210 179 30 942 232 196 385<br />
233 mm 1660 1710 1000 1045 1570 75 273 1210 179 30 942 232 196 385<br />
1. Control panel;<br />
2. Isolat or;<br />
3. Electrical board;<br />
4. Compressor;<br />
5. Pump (P1 – P2, ASP1 – ASP2 installation);<br />
6. Fan;<br />
7. Anti-vi bration support (KSA acc essor y);<br />
8. Coil;<br />
9. Protecti on mes h (KRP access ory);<br />
10. Expansion vessel;<br />
11. Power suppl y inl et;<br />
12. Water inlet;<br />
13. Water outlet;<br />
14. Pressure gauge<br />
15. Wat er buffer t ank drain (ASP1 – ASP2 i nstallati on);<br />
16. Condensation drain (<strong>THAEY</strong> models);<br />
17. Water buffer tank (ASP1 – ASP2 i nstallati on);<br />
Installation<br />
○ The unit is designed for outdoor inst allation.<br />
○ The unit is equipped wit h male threaded water connections.<br />
○ The unit must be positioned to c ompl y with the mi nimum<br />
recommended cl earances, bearing in mind the acc ess t o wat er and<br />
electrical connections .<br />
○ The unit c an be equipped wit h anti- vibration mountings on request<br />
(KSA).<br />
○ We recommend installing intercept valves that isolate the unit fr om<br />
the res t of the s yst em.<br />
○ It is ess ential to fit a metal mes h filter (squar e mesh of no greater<br />
than 0. 8 mm) on the unit ret urn piping.<br />
○ The unit may not be inst alled on brac kets or shel ves.<br />
○ Correct installation and positioning includes levelling the unit on a<br />
surface c apable of bearing its weight.<br />
L4<br />
Clearances and positioning<br />
L3<br />
L1<br />
Model 133 233<br />
L1 mm 800 800<br />
L2 mm 1000 1000<br />
L3 mm 800 800<br />
L4 mm 800 800<br />
Movement<br />
○ The unit s houl d be handled with c are, in order to avoi d damage t o<br />
the exter nal struc ture and t o t he internal mechanical and el ectrical<br />
components.<br />
○ Do not stack the units.<br />
○ The t emperature li mits for s torage are -9° ÷45°C.<br />
L2<br />
Weights<br />
Model 133 233<br />
<strong>TCAEY</strong> Standard installation kg 400 415<br />
<strong>THAEY</strong> Standard installation kg 415 430<br />
<strong>TCAEY</strong> P1 installation kg 420 430<br />
<strong>THAEY</strong> P1 installation kg 435 445<br />
<strong>TCAEY</strong> P2 installation kg 420 430<br />
<strong>THAEY</strong> P2 installation kg 435 445<br />
<strong>TCAEY</strong> ASP1 installation kg 450 465<br />
<strong>THAEY</strong> ASP1 installation kg 460 475<br />
<strong>TCAEY</strong> ASP2 installation kg 450 465<br />
<strong>THAEY</strong> ASP2 installation kg 460 475<br />
The weights refer t o units without wat er.<br />
The weight of t he full unit is obt ained by adding t o t he weight of the tank<br />
wat er contents, i ndicated in t abl e “A”.<br />
43