HEINERSCHEID<br />

Wind Farm<br />

Wandpark Gemeng Hengischt S.A<br />

Maison 21 • L-9753 Heinerscheid • Luxembourg<br />

Tel: +352 99 85 08-1 • Fax: +352 99 76 82<br />

On the basis of the Energy Law which came<br />

into force on the 5 th August 1993, the Luxembourg<br />

government concentrated on promoting<br />

the use of renewable energies. Wind<br />

power has come to have an important role<br />

as it has the greatest economic development<br />

potential of all the renewable energy<br />

possibilities in Luxembourg. The project<br />

was the establishment of a large wind farm<br />

in the commune of Heinerscheid, located<br />

on the northern tip of Luxembourg.<br />

Main aims and motivations<br />

The project set out to fully exploit the potential<br />

of wind power, to raise the share of<br />

RES in the area and to fulfil the regulatory<br />

guidelines as to the promotion and<br />

utilization of Renewable Energy Sources<br />

in Luxembourg.<br />

The project<br />

Heinerscheid was selected as it experiences<br />

favourable wind measures and is at an acceptable<br />

distance from residential areas,<br />

protected areas such as nature reserves<br />

and the national grid.<br />

In 1996 the local council assigned the<br />

Energy Agency the task of developing a<br />

concept for making use of wind energy.<br />

Many interested parties had addressed the<br />

council to obtain permission to set up a<br />

wind farm in Heinerscheid. The council<br />

proposed that all parties join together with<br />

the united aim of planning, building and<br />

managing a wind farm. The wind farm was<br />

established in three Building Phases. The<br />

first was of 3 turbines with an output of<br />

600 kW per machine and was completed<br />

by autumn 1998, the second was of 5 wind<br />

turbines at 1,000 kW per turbine and they<br />

were running by the end of 1999. The final<br />

phase set up 3 turbines with an output of<br />

1,800 kW each.<br />

The total installed capacity of the<br />

Heinscheid wind farm is 12,200kW.<br />

An innovative partnership scheme<br />

The partnership scheme between the interested<br />

parties, who after much organizing,<br />

founded the Wandpark Gemeng Hengsicht<br />

S.A. The capital 3,200,000 Euro, divided<br />

into 12,800 shares at 250 Euro each. The<br />

local council is the legal holder of 22.5%<br />

of the shares and aims to sell 20% to the<br />

local community. This keeps the community<br />

involved with and concerned for the<br />

success of the wind farm.<br />

Overall Evaluation<br />

The project has been successfully implemented<br />

and is in good working order. The<br />

electricity generated by the wind farm substitutes<br />

fossil fuel use and about 14,375<br />

tonnes of CO 2<br />

emissions are being saved<br />

annually. The project meets requirements<br />

of noise limitation, shading and minimum<br />

distance from protected areas.<br />

Enabling factors<br />

The financial outlay for the wind farm was<br />

divided by the different companies participating,<br />

each of them having a certain<br />

amount of shares in the farm. Approx 1.1<br />

m of the total investment was financed<br />

through national government subsidies.<br />

In Heinerscheid feed-in tariffs for electricity<br />

produced from wind power, which were<br />

established by the Grand-Ducal regulation<br />

of May 30 th , 1994, are set at levels that<br />

render wind farm operation a profitable<br />

endeavour.<br />

Challenges<br />

There were no real obstacles to the project<br />

apart from a few technical setbacks. Problems<br />

occurred with the gearboxes of the<br />

wind turbines, which needed to be replaced.<br />

Two propellers were also replaced during<br />

the warranty period.<br />

Replication Potential<br />

Such a co-operation is possible anywhere.<br />

The wind farm makes a useful working<br />

model for other interested companies or<br />

organizations. Many municipalities have<br />

already contacted Heinerscheid for information<br />

with a view to implementing similar<br />

projects in their area.<br />

Heinerscheid proves that municipal authorities<br />

can act very successfully as cocoordinators<br />

for wind farm construction.<br />

A wind farm situated between Heinerscheid<br />

and Kehmen is currently in the process of<br />

being established.<br />

RES Increase<br />

The energy produced each year is enough<br />

to supply 6,000 households (at 4,000 kWh<br />

per household) this equates to 0.6% of the<br />

total energy demand on the public Electricity<br />

grid.<br />

Business year Energy production Contribution of phase 1 Contribution of phase 2<br />

1999 3.9 GWh 3.9 GWh 0.0 GWh<br />

2000 11.9 GWh 3.7 GWh 8.2 GWh<br />

2001 11.1 GWh 3.6 GWh 7.5 GWh<br />

2002 11,6 11.6 GWh 3,6 3.6 GWh 8,0 8.0 GWh<br />

66 <strong>CTO</strong> - Showcase