1153 Performance Task Manual - South Carolina Fire Academy
1153 Performance Task Manual - South Carolina Fire Academy
1153 Performance Task Manual - South Carolina Fire Academy
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>1153</strong>- NFPA <strong>Fire</strong>fighter 1 <strong>Performance</strong> <strong>Task</strong><br />
Evaluation Sheet 7-14<br />
®<br />
Objective: Prepare a dry hoseline for hoisting. (NFPA 1001, 5.1.1)<br />
Student Name: Date:<br />
Directions<br />
For this skills evaluation checklist, students will correctly prepare a dry hoseline for hoisting.<br />
Equipment & Materials<br />
• Full protective clothing • Rope<br />
• 100 feet hose with nozzle •<br />
Criteria & Evaluation Comments<br />
After the candidate has completed the skill sheet, write comments below.<br />
Evaluator/Candidate Comments<br />
Evaluator must initial outcome<br />
Pass<br />
Fail<br />
Evaluator Signature Date Student Signature Date<br />
<strong>Task</strong> Steps 1 st 2nd<br />
1. Lower an appropriate length of rope from the intended destination of the<br />
hoseline.<br />
2. Fold the nozzle end of the hoseline backover the rest of the hose so that the<br />
overlap of 4 to 5 feet is formed.<br />
3. Tie a clove hitch, with an overhand safety know, around the tip of the nozzle<br />
and the hose it is floded against so that they are lashed together.<br />
4. Place a half hitch on the doubled hose about 12 inches from the loop end.<br />
<strong>South</strong> <strong>Carolina</strong> <strong>Fire</strong> <strong>Academy</strong> <strong>Performance</strong> Skill 7-14