21.11.2014 Views

1153 Performance Task Manual - South Carolina Fire Academy

1153 Performance Task Manual - South Carolina Fire Academy

1153 Performance Task Manual - South Carolina Fire Academy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>1153</strong> – NFPA <strong>Fire</strong>fighter I <strong>Performance</strong> <strong>Task</strong><br />

Evaluation Sheet 12-4<br />

®<br />

Objective : Deploy a portable water tank. (NFPA 1001, 5.3.15)<br />

Student Name: Date:<br />

Directions<br />

For this skills evaluation checklist, students will deploy a portable water tank. This skill sheet is written for<br />

a jet siphon. A plain siphon, commercial tank-connecting device, permanent tank gravity drain, or drain<br />

tunnel connector may also be used. Remind students to always follow the manufacturer’s instructions for<br />

the specific equipment they are using. Students will work with another student to perform this skill. After<br />

actual use, the tarps, tanks, and siphons will be wet and dirty. They must be cleaned and dried before<br />

storage.<br />

Equipment & Materials<br />

• Apparatus-mounted portable reservoirs • Siphon and appropriate siphon hose/tubing or<br />

other means of transferring water from one tank to<br />

another<br />

• Reservoir manufacturer’s setup instructions • Two heavy tarps<br />

• Protective clothing<br />

Criteria & Evaluation Comments<br />

After the candidate has completed the skill sheet, write comments below.<br />

Evaluator/Candidate Comments<br />

Pass<br />

Fail<br />

Evaluator Signature Date Student Signature Date<br />

<strong>South</strong> <strong>Carolina</strong> <strong>Fire</strong> ACademy <strong>Performance</strong> Skill 12-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!