1153 Performance Task Manual - South Carolina Fire Academy
1153 Performance Task Manual - South Carolina Fire Academy
1153 Performance Task Manual - South Carolina Fire Academy
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>1153</strong> – NFPA <strong>Fire</strong>fighter I <strong>Performance</strong> <strong>Task</strong><br />
Evaluation Sheet 12-4<br />
®<br />
Objective : Deploy a portable water tank. (NFPA 1001, 5.3.15)<br />
Student Name: Date:<br />
Directions<br />
For this skills evaluation checklist, students will deploy a portable water tank. This skill sheet is written for<br />
a jet siphon. A plain siphon, commercial tank-connecting device, permanent tank gravity drain, or drain<br />
tunnel connector may also be used. Remind students to always follow the manufacturer’s instructions for<br />
the specific equipment they are using. Students will work with another student to perform this skill. After<br />
actual use, the tarps, tanks, and siphons will be wet and dirty. They must be cleaned and dried before<br />
storage.<br />
Equipment & Materials<br />
• Apparatus-mounted portable reservoirs • Siphon and appropriate siphon hose/tubing or<br />
other means of transferring water from one tank to<br />
another<br />
• Reservoir manufacturer’s setup instructions • Two heavy tarps<br />
• Protective clothing<br />
Criteria & Evaluation Comments<br />
After the candidate has completed the skill sheet, write comments below.<br />
Evaluator/Candidate Comments<br />
Pass<br />
Fail<br />
Evaluator Signature Date Student Signature Date<br />
<strong>South</strong> <strong>Carolina</strong> <strong>Fire</strong> ACademy <strong>Performance</strong> Skill 12-4