21.11.2014 Views

1153 Performance Task Manual - South Carolina Fire Academy

1153 Performance Task Manual - South Carolina Fire Academy

1153 Performance Task Manual - South Carolina Fire Academy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>1153</strong>- NFPA <strong>Fire</strong>fighter 1 <strong>Performance</strong> <strong>Task</strong><br />

Evaluation Sheet 11-3<br />

Objective:<br />

Ventilate a structure using mechanical positive-pressure ventilation.<br />

®<br />

(NFPA 1001, 5.3.11)<br />

Student Name: Date:<br />

Directions<br />

For this skills evaluation checklist, students will correctly perform horizontal ventilation on a structure<br />

operating as part of a team, given an assignment, personal protective equipment, ventilation tools,<br />

equipment, and ladders, so that the ventilation openings are free of obstructions, tools are used as<br />

designed, ladders are correctly placed, ventilation devices are correctly placed, and the structure is<br />

cleared of smoke.<br />

Equipment & Materials<br />

• Full protective clothing • Positive pressure fan<br />

• Structure<br />

Criteria & Evaluation Comments<br />

After the candidate has completed the skill sheet, write comments below.<br />

Evaluator/Candidate Comments<br />

Evaluator must initial outcome<br />

Pass<br />

Fail<br />

Evaluator Signature Date Student Signature Date<br />

<strong>South</strong> <strong>Carolina</strong> <strong>Fire</strong> <strong>Academy</strong> <strong>Performance</strong> Skill 11-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!