Preparation Phase<br />
Jacking Steelwork & Over plating<br />
Before any work could be started a substantial amount of<br />
preparation was required.<br />
Large areas of the collector mains required over plating to<br />
ensure there was enough “mechanical strength” to carry out<br />
the replacement task.<br />
Additional steelwork was erected to provide “jacking points”<br />
for splitting the flanges with hydraulic jacks.<br />
Pressure control and purging operations<br />
Nitrogen purge points and re-circulating gas stabbings were “hottapped”<br />
into the crossover mains to facilitate pressure control and<br />
purging operations.<br />