<strong>Crossover</strong> <strong>Main</strong> <strong>Replacement</strong><br />

Horizontal Section Removal<br />

When the pipe work was lowered to the floor level, it was<br />

clear to see it’s poor condition and the necessity to support<br />

the pipe at one-metre intervals.<br />

Also as the “gas flow” tests performed prior to the work<br />

starting indicated, the pipe cross sectional area was<br />

substantially reduced by deposits effecting gas flow through<br />

the pipe.<br />