<strong>Crossover</strong> <strong>Main</strong> <strong>Replacement</strong><br />
Horizontal Section Removal<br />
When the pipe work was lowered to the floor level, it was<br />
clear to see it’s poor condition and the necessity to support<br />
the pipe at one-metre intervals.<br />
Also as the “gas flow” tests performed prior to the work<br />
starting indicated, the pipe cross sectional area was<br />
substantially reduced by deposits effecting gas flow through<br />
the pipe.<br />