Introduction<br />
The first two options were not viable, firstly each of the<br />
crossover mains had previously been “over-plated”, and this<br />
would only prove to be a short-term repair.<br />
Secondly even though it was possible to operate the plant on<br />
a single Gas Collecting <strong>Main</strong> the operating tolerances were<br />
too fine, due to the size of our oven design and size of out<br />
Ascension pipes.<br />
Stopping the coke making process to replace these crossover<br />
mains was not an option, so plans were put together to<br />
change all four mains on a “live gas” system.<br />
This is believed to be a first for Tata Steel Europe if not<br />
worldwide.<br />
5