Introduction<br />

The first two options were not viable, firstly each of the<br />

crossover mains had previously been “over-plated”, and this<br />

would only prove to be a short-term repair.<br />

Secondly even though it was possible to operate the plant on<br />

a single Gas Collecting <strong>Main</strong> the operating tolerances were<br />

too fine, due to the size of our oven design and size of out<br />

Ascension pipes.<br />

Stopping the coke making process to replace these crossover<br />

mains was not an option, so plans were put together to<br />

change all four mains on a “live gas” system.<br />

This is believed to be a first for Tata Steel Europe if not<br />

worldwide.<br />