Installing the new <strong>Crossover</strong> <strong>Main</strong>s<br />
Installation of the new horizontal section<br />
Prior to the installation of each new horizontal section all the<br />
support steelwork was upgraded to ensure good mechanical<br />
integrity and extend the life expectancy.<br />
The installation process was simply the reverse of the<br />
removal process.<br />
The new vertical legs were lifted and secured into place, and<br />
then the horizontal sections complete with all new service<br />
pipe work and expansion joint was lifted into place.<br />
<strong>Main</strong>taining good visual and radio contact with the crane<br />
operator was essential throughout the lift.<br />