Installing the new <strong>Crossover</strong> <strong>Main</strong>s<br />

Installation of the new horizontal section<br />

Prior to the installation of each new horizontal section all the<br />

support steelwork was upgraded to ensure good mechanical<br />

integrity and extend the life expectancy.<br />

The installation process was simply the reverse of the<br />

removal process.<br />

The new vertical legs were lifted and secured into place, and<br />

then the horizontal sections complete with all new service<br />

pipe work and expansion joint was lifted into place.<br />

<strong>Main</strong>taining good visual and radio contact with the crane<br />

operator was essential throughout the lift.<br />