Installing the new <strong>Crossover</strong> <strong>Main</strong>s<br />
Removing the Blanking plates<br />
With the installation of the new pipe work complete the next<br />
phase of the installation was the removal of the spade that<br />
was preventing the gas flow over the new pipe.<br />
Again the pressure control was critical to the success of this<br />
phase, so to ensure the precise control required for this task,<br />
the system was controlled manually using pressure gauges<br />
and vent pipes to provide a visual indication to the controller.<br />
The coke side spade was removed first followed by the ram<br />
side.<br />