Installing the new <strong>Crossover</strong> <strong>Main</strong>s<br />

Removing the Blanking plates<br />

With the installation of the new pipe work complete the next<br />

phase of the installation was the removal of the spade that<br />

was preventing the gas flow over the new pipe.<br />

Again the pressure control was critical to the success of this<br />

phase, so to ensure the precise control required for this task,<br />

the system was controlled manually using pressure gauges<br />

and vent pipes to provide a visual indication to the controller.<br />

The coke side spade was removed first followed by the ram<br />

side.<br />