Preparation Phase<br />
Spreader beam<br />
Due to the visibly poor condition of the existing crossover<br />
mains, there was real concern that the horizontal section of<br />
the main could collapse under it’s own weight during the<br />
removal process.<br />
Therefore a bespoke “spreader beam” was designed and<br />
manufactured, that supported the pipe at one-metre pitches to<br />
mitigate this problem.<br />
13