Crossover Main Replacement - Coke Oven Managers Association
Crossover Main Replacement - Coke Oven Managers Association
Crossover Main Replacement - Coke Oven Managers Association
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Installing the new <strong>Crossover</strong> <strong>Main</strong>s<br />
Installation of Bend Section<br />
The final section to be fitted is the bend.<br />
The bend section was cut to suit, allowing for the difference in<br />
the new installation fitting to the existing pipe work that is still<br />
operational and carrying hot gas.<br />
The bend was measured and tacked on site then removed<br />
backed to a workshop for completion.<br />
27