25.11.2014 Views

Crossover Main Replacement - Coke Oven Managers Association

Crossover Main Replacement - Coke Oven Managers Association

Crossover Main Replacement - Coke Oven Managers Association

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Installing the new <strong>Crossover</strong> <strong>Main</strong>s<br />

Installation of Bend Section<br />

The final section to be fitted is the bend.<br />

The bend section was cut to suit, allowing for the difference in<br />

the new installation fitting to the existing pipe work that is still<br />

operational and carrying hot gas.<br />

The bend was measured and tacked on site then removed<br />

backed to a workshop for completion.<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!