ANP Sustainment<br />

Process Highlights & Friction Points<br />

• MMC forwards requirements to DOL for procurement of<br />

items not in inventory<br />

• MMC Item Manager validates MoI 14 and forwards to<br />

NLC.<br />

• NLC issues MoI 9.<br />

• Trans BDE programs movement to RLC<br />

• Loss of visibility of MoI 14s at MMC<br />

• No feedback on request status<br />

• No Demand Signal/ Inventory visibility / Excess<br />

Management.<br />

• Limited sustainment convoys (1 per month if at all)<br />

30-35<br />

Days<br />

14-28<br />

Days<br />

DOL<br />

MMC<br />

NLC<br />

Trans<br />

BDE<br />

• RLC validates requests<br />

• RLC checks stocks on hand; issues MoI 9 and<br />

equipment<br />

• MoI 14 forwarded to MMC if equipment is not on<br />

hand<br />

• HQ units pick up equipment from RLC<br />

• Signatures required for MoI 14 to leave RLC<br />

• Limited digital system for MoI<br />

• Demand history is not tracked<br />

4-6<br />

Days<br />

RLC<br />

4-7<br />

Days<br />

• HQ validates requests<br />

• MSP checks stocks on hand; if not available MoI 14 is<br />

sent to the RLC<br />

• Issues MoI 9 and equipment to requesting units<br />

• If MoI 14 is denied, no feedback provided<br />

• Signatures required by HQ leadership<br />

• Limited MSPs are available<br />

• Limited stock at MSPs<br />

• Unit request supply item and fills out MoI 14.<br />

• Signature required on MoI 14 by unit leadership<br />

• Lack of formalized catalogue<br />

2-3<br />

Days<br />

2-3<br />

Days<br />

HQ<br />

Unit<br />

MSP<br />

2-3<br />

Days<br />

58-85 Days Total<br />

BLUF:<br />

• The developing ANP Supply System and limited stock at the RLCs creates a slower system than developed systems.<br />

• ANP are developing their COREIMS capabilities, but are still far behind, causing difficulties with the MoI 14 process.<br />

• MoI 14 can be killed at any level w/o feedback .<br />

• Immaturity of Afghan contracting takes 6 – 12 months to deliver which necessitates detailed Log planning at the MoI Level.<br />

Process Improvements:<br />

NLC<br />

• Develop National Catalog<br />

• Continue to establish CORE IMS<br />

capability<br />

• Increase frequency of ANP convoys<br />

• Establish demand history of requested<br />

items to build and refine ASL<br />

• Utilize contracted convoys to increase<br />

sustainment frequency<br />

RLC<br />

• Establish demand history of requested<br />

items to build and refine ASL<br />

• Literacy programs<br />

• CORE IMS Network Expansion/<br />

Implementation to all RLCs<br />

• Improve MoI14 status requests from<br />

MMC<br />

Kandak/ Provincial HQ<br />

• Approved ASL followed by resourced ASL<br />

• Literacy programs<br />

• Improve MoI14 status requests from RLC<br />

Unit/District<br />

• Literacy programs<br />

• Improve MoI14 status requests from HQs<br />

Friction Points<br />

Critical Node (Down)<br />

Critical Node (Up)<br />

Flow of MoI 14 Request<br />

Flow of MoI 9 and<br />

equipment<br />

1<br />

B 24<br />