UNCLASS//FGI ISAF NATO //REL to USA, ISAF, NATO//FOUO<br />

This document is not approved for public release<br />

Current as of: 2 Dec 2013<br />

POC: IJC ANSF DIR<br />

DSN 318-449-9524<br />

Process Highlights & Friction Points<br />

• MoI identifies and develops requirements<br />

• Equipment is procured by DOL<br />

• MMC tracks equipment and requirements<br />

• NLC receives /ships equipment to RLC<br />

• Items are not in inventory<br />

• Delayed entry into country<br />

• Equipment shipped to RLC for distribution<br />

• RLC distributes to MSPs<br />

• Establishment of distribution plan<br />

• Establishing New Equipment Training (NET)<br />

• Limited MSP available<br />

ANP Equipment Fielding<br />

2-3<br />

Weeks<br />

MoI<br />

DOL<br />

MMC<br />

NLC<br />

RLC<br />

MSP<br />

Process Improvements:<br />

MoI<br />

• Requirements generation<br />

• Strategic planning<br />

• Bureaucratic issue process<br />

• Multiple Tashkils<br />

• Accountability<br />

• Established ASL determined and procured<br />

prior to fielding<br />

• Efficient Push and Movement of Equipment to<br />

Unit<br />

RLC<br />

• Accountability<br />

• New equipment training<br />

• Cross leveling<br />

• ASL establishment packages<br />

• HQs/Units receive equipment<br />

• Conduct New Equipment Training<br />

• NET planned but not conducted by all<br />

2-3<br />

Weeks<br />

NET<br />

2-3<br />

Days<br />

New<br />

Equipment<br />

Training<br />

HQs<br />

HQs/ Units<br />

• Sustainment package with initial<br />

fielding<br />

• New Equipment Training (NET) plan and<br />

Execution<br />

Critical Node (Down)<br />

Units<br />

Friction Points<br />

Flow of Equipment<br />

BLUF:<br />

• Equipment procured without full sustainment consideration. Results in part shortages and subsequently vehicles awaiting repairs.<br />

• Push letters not issued in a timely manner delaying fielding often > 30 days.<br />

• Once Title Transfers are complete vehicle visibility is lost and may be given to different recipients.<br />

B 26<br />

UNCLASS//FGI ISAF NATO //REL to USA, ISAF, NATO//FOUO