CWRB Briefing Slides - U.S. Army Corps of Engineers
CWRB Briefing Slides - U.S. Army Corps of Engineers
CWRB Briefing Slides - U.S. Army Corps of Engineers
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Onion Creek Policy & Technical<br />
Review Process<br />
• Feasibility Scoping Meeting (FSM): 20 Aug 2003<br />
• Alternative Plan Formulation <strong>Briefing</strong> (AFB): 25 May 2006<br />
• Report Independent Technical Review Completed: 17 Aug 2006<br />
• FDR Center <strong>of</strong> Expertise (SPD) Contacted. Identified Louisville as<br />
lead District.<br />
• Multi-District ITR team: Louisville, Tulsa, Los Angeles.<br />
• 110 comments – All resolved<br />
• HQ Policy/Report Review Completed: 28 Sep 2006<br />
October 26, 2006<br />
One Team: Relevant, Ready, Responsive and Reliable<br />
25