Lower Colorado River Basin - Wharton<br />

Flood Damage Reduction and Ecosystem Restoration Project<br />

Interior Drainage<br />

Concern: Sumps were added to the recommended plan to deal with interior drainage d<br />

issues. No minimal facilities were determined. If the recommended sumps are<br />

larger than needed to meet the minimal facility requirement then they must either be<br />

incrementally justified or identified as a component that is a 100% 1<br />

non-Federal<br />

cost.<br />

Reason: As per EM 1110-2-1413 1413 and PGL #37 minimal facilities are intended as a starting<br />

point from which additional interior facilities planning will be based.<br />

Resolution: The district needs to evaluate the minimum facility requirements and<br />

determine the difference between the minimal facility and the recommended option.<br />

Resolution Impact: Should not delay initiation <strong>of</strong> S&A review. Perform P<br />

analysis during<br />

during S&A review.<br />