CWRB Briefing Slides - U.S. Army Corps of Engineers
CWRB Briefing Slides - U.S. Army Corps of Engineers
CWRB Briefing Slides - U.S. Army Corps of Engineers
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PDT Performance<br />
• Performed well throughout the study, and outstanding down the<br />
stretch.<br />
• Representatives from:<br />
• each discipline, utilizing consultants and staff from two <strong>Corps</strong><br />
Districts.<br />
• each local sponsor on the PDT.<br />
• resource agencies.<br />
• Expedited study execution by five months to meet schedule<br />
for potential contingent authorization.<br />
• Addressed ITR and HQ concerns.<br />
• Incorporated two reports into one project report.<br />
October 26, 2006<br />
One Team: Relevant, Ready, Responsive and Reliable<br />
9