19.01.2015 Views

CWRB Briefing Slides - U.S. Army Corps of Engineers

CWRB Briefing Slides - U.S. Army Corps of Engineers

CWRB Briefing Slides - U.S. Army Corps of Engineers

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PDT Performance<br />

• Performed well throughout the study, and outstanding down the<br />

stretch.<br />

• Representatives from:<br />

• each discipline, utilizing consultants and staff from two <strong>Corps</strong><br />

Districts.<br />

• each local sponsor on the PDT.<br />

• resource agencies.<br />

• Expedited study execution by five months to meet schedule<br />

for potential contingent authorization.<br />

• Addressed ITR and HQ concerns.<br />

• Incorporated two reports into one project report.<br />

October 26, 2006<br />

One Team: Relevant, Ready, Responsive and Reliable<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!