CWRB Briefing Slides - U.S. Army Corps of Engineers
CWRB Briefing Slides - U.S. Army Corps of Engineers
CWRB Briefing Slides - U.S. Army Corps of Engineers
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
US <strong>Army</strong> <strong>Corps</strong><br />
<strong>of</strong> <strong>Engineers</strong> ®<br />
Rationale for<br />
SWD Support<br />
• Concur with Fort Worth District (SWF) Commander’s findings<br />
and recommendations<br />
• Report complies with all applicable policies and laws in place at<br />
this time<br />
– FEMA funded land-buy within project site<br />
– To be addressed in PED<br />
• Anticipate a favorable response to the draft Chief’s Report<br />
– USFWS has not concurred with plan (issue: want different<br />
mitigation strategy than USACE regulations allow)<br />
– Agreed to find solution in PED<br />
• Plan supported by sponsor and congressional delegation<br />
One <strong>Corps</strong> Serving The <strong>Army</strong> and the Nation<br />
9/8/2006