CWRB Briefing Slides - U.S. Army Corps of Engineers
CWRB Briefing Slides - U.S. Army Corps of Engineers
CWRB Briefing Slides - U.S. Army Corps of Engineers
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Value Engineering<br />
Lower Colorado River Basin<br />
Flood Damage Reduction and Ecosystem Restoration Project<br />
Comment: VE effort inadequate for planning phase. Potential savings and/or<br />
improvements were not part <strong>of</strong> defining & selecting the best plan.<br />
Reason: Value Management Workshop required prior to the selection <strong>of</strong> final<br />
alternatives (ER 11-1-321)<br />
Resolution: Resolved - complete VE study early in PED<br />
- may require evidence <strong>of</strong> VE actions in all AFB review submittals<br />
Resolution Impact: Stay on schedule, but any VE induced changes identified in<br />
PED may or may not be within discretionary authority<br />
9/8/2006<br />
82