CWRB Briefing Slides - U.S. Army Corps of Engineers
CWRB Briefing Slides - U.S. Army Corps of Engineers
CWRB Briefing Slides - U.S. Army Corps of Engineers
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Wharton Policy & Technical<br />
Review Process<br />
• Feasibility Scoping Meeting (FSM): 20 Aug 2003<br />
• Alternative Plan Formulation <strong>Briefing</strong> (AFB): 24 Apr 2006<br />
• Report Independent Technical Review Completed: 17 Aug 2006<br />
• Performed by Tulsa District.<br />
• 143 Comments – All resolved.<br />
• HQ Policy/Report Review Completed: 28 Sep 2006<br />
October 26, 2006<br />
One Team: Relevant, Ready, Responsive and Reliable<br />
32