7. System examples<br />
7.6 Freshwater station as<br />
cascade connection<br />
Should larger volumes of hot water be needed, overflow<br />
valves allow for the interconnection of two or more<br />
freshwater stations as a cascade. Here, the service<br />
water circulation module can be left out for the second<br />
and other freshwater stations.<br />
The circulation is controlled only by the first freshwater<br />
station.<br />
Basic circuit diagram:<br />
Second station First station<br />
Required accessories:<br />
Overflow valve DN 25 for<br />
Cascade connection<br />
Adjustment range:<br />
100 to 500 mbar<br />
Article no.: 69072.9<br />
16<br />
Domestic water<br />
hot<br />
Domestic water<br />
cold<br />
7.6.1 Initial operation and<br />
<strong>system</strong> calibration of the<br />
freshwater cascade<br />
First station<br />
■ Initial operation and <strong>system</strong> calibration from point 6<br />
■ Setting the time and date, point 5.3.3<br />
■ Domestic hot ■ set value e.g.: 50°C, point<br />
water 5.3.3 and 5.3.5<br />
■ Circulation ■ Basic setting menu,<br />
Circulation submenu = select<br />
“on”, point 5.3.5<br />
■ In programming menu,<br />
circulation submenu up to<br />
3 select time slot, point 5.3.3<br />
■ Circulation temperature<br />
40°C, for control in time slot,<br />
point 5.3.5<br />
■ Circulation time e.g.: 60 s,<br />
Circulation rest time.: e.g.<br />
10 min, for controlling the<br />
circulation through tapping<br />
detection outside the time<br />
slot, point 5.3.5<br />
■ Heat transfer unit ■ WT = cold, point 5.3.3<br />
■ Time lag ■ e.g.: 20 s, point 5.3.5<br />
Second station<br />
■ Initial operation and <strong>system</strong> calibration:<br />
The determined values of the characteristic curve<br />
calibration of the first station are taken over. These<br />
values are read in the first control <strong>system</strong> in the<br />
basic setting menu, characteristic curve submenu<br />
and in the same menu they are set in the second<br />
control <strong>system</strong>.<br />
■ Setting the time and date, point 5.3.3<br />
■ Domestic hot ■ Set value e.g.: 50°C,<br />
water point 5.3.3 and 5.3.5<br />
■ Circulation off<br />
■ Heat transfer unit ■ WT = cold, point 5.3.3<br />
■ After-run ■ e.g.: 20 s, point 5.3.5<br />
Differential pressure-overflow valve<br />
Hot water should be drawn off of e.g.: 35l/min.<br />
This domestic water volumetric flow can be read in<br />
the control <strong>system</strong> information menu of the first<br />
freshwater station. Set the differential pressureoverflow<br />
valve so that the second freshwater station<br />
starts operating (determination of opening pressure of<br />
the overflow valve). Loosen the locking screw at the<br />
differential pressure-overflow valve. Afterwards the<br />
opening pressure can be adjusted in stages by turning<br />
the hand wheel valve. The selected position should<br />
subsequently be checked at the locking screw to<br />
ensure it against accidental adjustment.