5.Control system - Meibes
5.Control system - Meibes
5.Control system - Meibes
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1. Safety instructions<br />
■ The installation and initial operation of the freshwater<br />
station is only to be carried out by a specialist<br />
tradesman.<br />
■ The necessary DIN and VDE provisions are to be<br />
observed (e.g. DIN 4751, DIN 4753, DIN 1988<br />
and VDE 0100)<br />
■ The provisions of local energy supply companies are<br />
to be observed<br />
■ Improper installation as well as misuse of the<br />
freshwater station will exclude any liability as regards<br />
guarantee claims<br />
Please note:<br />
■ Before operating on the control <strong>system</strong> and the<br />
circulating pump, they are to be switched at zero<br />
potential as prescribed<br />
■ In the event of a power supply interruption, the<br />
preset values are retained<br />
■ In the event of a power failure, the <strong>system</strong> clock<br />
settings in the control <strong>system</strong> are retained for<br />
approx. 24 hours<br />
2. Technical specifications<br />
Heating connections 3/4“ female 3/4“ IG<br />
Plumbing connections 3/4” female 3/4” IG<br />
Heating operating pressure 3 bar<br />
Plumbing operating pressure 6 bar<br />
Maximum allowed temperature 110°C<br />
Controller protection class IP 54<br />
Supply voltage 230VAC / 50Hz<br />
Dimensions (height/length/breadth) in mm 660 x 455 x 215<br />
2<br />
■ A menu for basic settings is available which may only<br />
be modified by a specialist tradesman. This ensures<br />
the technical functioning and security of the <strong>system</strong>!<br />
■ All the relevant old as well as recently enforced<br />
provisions and norms as well as provisions and<br />
norms not mentioned, but relevant for application in<br />
a particular case, are to be followed<br />
■ The legal provisions relating to the prevention of<br />
accidents are to be followed